OPERATING PROCEDURE
PHOTOS/FIGURES
4. Removing the nozzle assembly
(1) Remove the panel (Refer to section 1.) and the corner
box.
(2) Remove the indoor/outdoor connecting wire (Refer to
section 2 (2)-(7).).
(3) Remove the indoor electronic control P.C. board hold-
er.
(4) Pull out the drain hose from the nozzle assembly and
remove the nozzle assembly.
Photo 5
5. Removing the horizontal vane motor
(1) Remove the nozzle assembly. (Refer to section 4.)
(2) Remove the screws of the horizontal vane motor unit.
(3) Disconnect the connector from the horizontal vane
motor.
(4) Remove the screws of the horizontal vane motor.
(5) Remove the horizontal vane motor from the horizontal
vane motor unit.
34
Screws of horizontal vane motor unit
OBH818C