51
DISASSEMBLY INSTRUCTIONS
11
OPERATING PROCEDURE
PHOTOS
1. Removing the front panel
(1) Remove the screw caps of the front panel.
Remove the screws.
(2) Pull the panel down to your side slightly and unhook the
catches at the top.
Photo 1
Photo 2
Screws
Front panel
11-1. MSH-XV07UV -
MSH-XV09UV -
MSH-XV12UV -
INDOOR UNIT
E1
E1
E1
2. Removing the electronic control P.C. board and the power
monitor, receiver P.C. board
(1) Remove the front panel. (Refer to 1)
(2) Remove the screw of the electrical cover.
Remove the electrical cover.
(3) Remove the V.A. clamp.
(4) Remove the cord clamp.
(5) Remove the screw of the terminal block.
(6) Remove the screw of the ground wire.
(7) Disconnect all the connectors and all the lead wires on the
electronic control P.C. board.
(8) Remove the R.L holder.
(9) Remove the electronic control P.C. board.
(10) Open the R.L holder and the power monitor, receiver P.C.
board.
Terminal block
cover
Room temperature
thermistor connector
Cord clamp
Indoor electronic
control P.C.board
Vane motor
connector
Fan motor connector
Screw of the ground wire
(1) Slide the sleeve and check if there is a locking lever or not.
(2) The terminal with this connector is a terminal
with lock mechanism.
1
Slide the sleeve.
2
Pull the terminal while
pushing the locking
lever.
1
Hold the sleeve, and
pull out the terminal
slowly.
In case of terminal with lock mechanism, detach the terminal as shown below.
There are two types ( Refer to (1) and (2)) of the terminal with lock mechanism.
The terminal with no lock mechanism can be removed by pulling it out.
Check the shape of the terminal and work.
<"Terminal with lock mechanism" Detaching points>
Connector
Sleeve
Locking lever
Screw of the
V.A. clamp
R.L holder
Power monitor,
receiver P.C.
board
OB294--2.qxp 02.1.26 1:53 PM Page 51
Summary of Contents for MSH-XV07UV
Page 2: ......