40
PCA-RP100GA
161
90
254
680
506
56
1228
Air intake
1214
270
207
81
96
1310
Air outlet
1240 (suspension bolt pitch)
140
150
320
80
18
70
6
87
182
198
245
16
217
(3/8F liquid)
(5/8F, 3/4F gas)
(Drainage)
7
2
Electrical box
70
229
3
2
8
5
1
4
Electrical box
When electrical
box is pulled
down
[ Front view ]
Ceiling
93
160
38
38
140
42
239
6~7
525
1235
687
263
171
138
86
192
236
1
45
Use the current nuts meeting the pipe size of the outdoor unit.
:Factory flare nut attachment to the heat-exchanger.
4
GAS SIDE
5
LIQUID SIDE
Available pipe size
RP100
[
9.52
[
15.88
[
19.05
P100
[
9.52
[
19.05
1
Drainage pipe connection (26mm I.D.)
2
Drainage pipe connection (for the left arrangement)
3
Knock out hole for left drain-piping arrangement
4
Refrigerant-pipe connection (gas pipe side/flared connection)
5
Refrigerant-pipe connection (liquid pipe side/flared connection)
6
Knock out hole for upper drain pipe arrangement
7
Knock out hole for left drain pipe arrangement
8
Knock out hole for wiring arrangement
Unit : mm
NOTES:
1. Use M10 or W3/8 screws for anchor bolt.
2. When optional drain lift-up mechanism is installed, always provide
upward piping for refrigerant piping.
OCS01-2.qxp 05.5.16 10:05 AM Page 40
Summary of Contents for Mr.SLIM PUHZ-RP140YHA
Page 50: ...50 WIRED REMOTE CONTROLLER Unit mm 130 120 19 ...
Page 51: ...51 WIRELESS REMOTE CONTROLLER Unit mm 159 3 55 58 19 ...
Page 53: ...53 PEAD RP35EA PEAD RP50EA PEAD RP60EA PEAD RP71EA PEAD RP100EA PEAD RP125EA PEAD RP140EA ...
Page 54: ...54 PEAD RP60GA PEAD RP71GA PEAD RP100GA ...
Page 83: ...83 9 2 PLA RP AA 9 2 1 FRESH AIR INTAKE AMOUNT ...
Page 84: ...84 ...
Page 85: ...85 9 2 2 BRANCH DUCT Installation at site ...
Page 95: ...95 PEAD RP60GA PEAD RP71GA ...
Page 96: ...96 PEAD RP100GA ...
Page 103: ...103 ...