4
B
J
O
N
F
Max. 300mm
[Fig. 6-10]
Correct piping
Wrong piping
A
Insulation (9 mm or more)
B
Downward slope (1/100 or more)
C
Support metal
K
Air bleeder
L
Raised
M
Odor trap
Grouped piping
D
O. D. ø32 PVC TUBE
E
Make it as large as possible. About 10 cm.
F
Indoor unit
G
Make the piping size large for grouped piping.
H
Downward slope (1/100 or more)
I
O. D. ø38 PVC TUBE for grouped piping.
(9 mm or more insulation)
PEAD-RP·JALQ model
J
Up to 700 mm
N
Drain hose (accessory)
O
Horizontal or slightly upgradient
[Fig. 6-11]
C
B
A
L
D
D
D
E
K
M
B
H
I
Max. 20m
1.5-2m
G
F
F
F
B
C
D
D
G
F
I
E
H
A
32
35
25
A
Indoor unit
B
Tie band (accessory)
C
Visible part
D
Insertion margin
E
Drain hose (accessory)
F
Drain pipe (O.D. ø32 PVC TUBE, field supply)
G
Insulating material (field supply)
H
Tie band (accessory)
I
To be gap free. The joint section of the insulation material meet must be at the top.
6
6.5
[Fig. 6-13]
A
Insert pump's end 2 to 4 cm.
B
Remove the water supply port.
C
About 2500 cc
D
Water
E
Filling port
F
Screw
[Fig. 6-12]
C
D
G
F
E
B
5
25
A
A
Indoor unit
B
Tie band (accessory)
C
Band fixing part
D
Insertion margin
E
Drain hose (accessory)
F
Drain pipe (O.D. ø32 PVC TUBE, field supply)
G
Insulating material (field supply)
A
B
F
C
D
E
00b_KB79U749H01_Illust.p65
10.10.14, 9:13
4