22
6
OUTLINES & DIMENSIONS
INDOOR UNIT
PEAD-RP35, 50, 60, 71, 100, 125, 140JAQ
(Actual length)
65
0
-10
Less than 300mm
Less than 700mm
Kx (L-1) =M
K
J
6
J
112
11
N-ø2.9
112
More than 20mm
More than 10mm
50
250 ~ 300
450
50
H
777
450
More than 300
<accessory>
Drain hose (I.D.ø32)
Make the access door at the appointed position properly for service maintenance.
Ceiling surface
Access door
Access door
Note2
Required space for service and maintenance
Air Filter
Suspension bolt hole
4-14x30 Slot
Air
outlet
Air
inlet
Refrigerant piping
Flare connection (liquid)
2
1
Refrigerant piping
Flare connection (gas)
Drain pump
Control box
Terminal block
(Indoor/Outdoor connecting line)
Terminal block
(Remote controller transmission line)
Drain pipe(O.D.ø32)
(Spontaneous draining)
Drain pipe
(O.D.ø32)
57
78
250
C
23
2X2-ø2.9
2xE-ø2.9
21
G
18
210
40
122
33
15
58
57
10
100
100x (E-1) =F
A
B (Suspension bolt pitch)
643
(Suspension bolt pitch)
30
20
D (Duct)
178(Duct)
40
23
10
238
32
700
732
136
67
356
100
41
217
NOTE 1. Use M10 screw for the Suspension bolt (field supply).
2. Keep the service space for the maintenance at the bottom.
3. This chart indicates for PEAD-RP60·71·100·125·140JAQ models,which have 2 fans. PEAD-RP35·50JAQ models
4. In case of the inlet duct is used,remove the air filter (supply with the unit), then install the filter (field supply)
have 1 fan.
at suction side.
Model
A
900
1100
1100
1400
1600
B
954
1154
1154
1454
1654
C
1000
1200
1200
1500
1700
D
860
1060
1060
1360
1560
E
9
11
11
14
16
F
800
1000
1000
1300
1500
G
858
1058
1058
1358
1558
H
1000
1200
1200
1500
1700
J
54
49
49
54
54
K
260
330
330
320
370
L
4
4
4
5
5
M
780
990
990
1280
1480
N
10
10
10
12
12
ø12.7
Gas pipe
Liquid pipe
ø15.88
ø6.35
ø9.52
PEAD-RP35,50JAQ
PEAD-RP60JAQ
PEAD-RP71JAQ
PEAD-RP100,125JAQ
PEAD-RP140JAQ
1
2
Outdoor unit (SUZ) : 6.35
Other Outdoor unit : 9.52
❈
❈
Setting at shipment.