170
4 ADVANCED POSITIONING CONTROL
4.5 Start Program for the Advanced Positioning Control
4.5
Start Program for the Advanced Positioning
Control
Starting the advanced positioning control
To execute the advanced positioning control, a program must be created to start the control in the same method as for the
major positioning control.
The following shows the procedure for starting the 1st point block start data (Regarded as block No.7000) set in the axis 1.
(1) Set 7000 in [Cd.3] Positioning start No. (By setting this value, the control is established as Advanced positioning control using the block start data.)
(2) Set the point number of Block start data started. (In this case, set 1.)
(3) Turn on Start signal.
(4) The positioning data set to 1st point block start data is started.
(1)
(2)
(4)
(3)
1500
Y10
1501
7000
1
ON
RD75
CPU module
I/O signals
Drive unit
Buffer memory
Control according
to the specified
positioning data
*: To start positioning with the next scan
after the previous positioning is
completed, input X10 signal as
an interlock so that the next positioning
is started once the X10 signal turns off
after the Y10 signal off.
Summary of Contents for MELSEC iQ-R RD75P4
Page 1: ...MELSEC iQ R Positioning Module User s Manual Application RD75P2 RD75P4 RD75D2 RD75D4 ...
Page 2: ......
Page 13: ...11 MEMO ...
Page 19: ...17 CONTENTS INDEX 588 REVISIONS 592 WARRANTY 593 TRADEMARKS 594 ...
Page 498: ...496 13 PROGRAMMING 13 2 List of Labels Used ...
Page 503: ...13 PROGRAMMING 13 4 Program Example 501 13 ...
Page 514: ...512 13 PROGRAMMING 13 4 Program Example Restart program Parameter data initialization program ...
Page 515: ...13 PROGRAMMING 13 4 Program Example 513 13 Flash ROM write program Error reset program ...
Page 516: ...514 13 PROGRAMMING 13 4 Program Example Stop program ...
Page 565: ...APPENDICES Appendix 4 Operation Examples of When the Remote Head Module Is Mounted 563 A ...
Page 597: ......