18. CNC CONNECTION
18.2 System Configuration
18 - 5
17
ROBOT
CONT
ROLLER
CONN
E
C
T
ION
18
CNC CONNECTION
19
ENER
GY M
EASU
RIN
G
UNIT/ELEC
TRIC M
UL
TI
-
MEA
S
UR
IN
G IN
STRUM
EN
T
CON
NEC
TION
20
GOT
MUL
T
I-
DROP
CONNECTION
21
M
U
LT
IP
LE
-G
T1
4,
GT
12
,
GT
11
, G
T10
CO
NNEC
TIO
N FUNCTION
22
MUL
T
I-CHANNE
L
FUNC
TION
23
F
A
TRANSP
A
R
ENT
FUNCT
ION
18.2.3 CC-Link connection (intelligent device station)
*1
The overall extension cable length and the length between stations vary depending on the cable type to be used and the total
number of stations.
For details, refer to the following manuals.
C6/C64/C64T CONNECTION AND MAINTENANCE MANUAL BNP-B2255
C6/C64/C64T NETWORK INSTRUCTION MANUAL BNP-B2373
*2
Specify Ver.1 as the mode setting in the Communication Settings to use it.
For details of the settings, refer to the following the manual.
18.4.1 Setting communication interface (Communication settings)
*3
For the specifications and inquiries of the CC-Link dedicated cable, refer to the following.
CC-Link Partner Association's home page: http://www.cc-link.org/
CC-Link Ver2(ID)
Communication driver
(When MODEL GT15-J61BT13
CC-Link communication unit is used)
CC-Link(ID)
(When MODEL GT15-75J61BT13-Z
CC-Link communication unit is used)
Communication driver
Expansion
unit
GOT
Connection cable
MELDAS
C6/C64
CNC
Connection cable
GOT
Number of
connectable
equipment
Model name
Expansion unit
Communication
type
Cable model
Max.
distance
Option device
Model
MELDAS C6/C64
FUC6-HR865
CC-Link(ID)
CC-Link dedicated
cable
*3
*1
GT15-J61BT13
*2
26 GOTs
GT15-75J61BT13-Z
Summary of Contents for GT15
Page 2: ......
Page 34: ...A 32 ...
Page 92: ......
Page 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Page 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Page 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Page 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Page 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Page 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Page 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Page 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Page 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Page 510: ......
Page 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Page 668: ......
Page 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Page 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Page 714: ......
Page 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Page 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Page 762: ......
Page 860: ...REVISIONS 4 ...
Page 863: ......