15 - 16
15. CONNECTION TO PANASONIC INDUSTRIAL DEVICES SUNX PLC
15.3 Connection Diagram
RS232 connection diagram 16)
(For GT1030, GT1020)
Precautions when preparing a cable
(1) Cable length
The length of the RS-232 cable must be 15m or
less.The length of the cable must be 3m or less with a
transmission speed of 38400bps.
(2) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
(3) Connector for Panasonic Industrial Devices SUNX
PLC
Use the connector applicable to the Panasonic
Industrial Devices SUNX PLC.
For details, refer to the Panasonic Industrial Devices
SUNX PLC user's manual.
15.3.2 RS-422 cable
Connection diagram
RS422 connection diagram 1)
(For GT16)
RS422 connection diagram 2)
(For GT16, GT15, GT14, GT12, GT11, GT105 , GT104 )
SD
RD
ER
DR
SG
RS
CS
NC
NC
RD
SD
SG
Receive data
Send data
GOT side
(terminal block)
PLC side
Grounding for
signals
SDA1(TXD1+)
SDB1(TXD1-)
RDA1(RXD1+)
RDB1(RXD1-)
SDA2(TXD2+)
SDB2(TXD2-)
RDA2(RXD2+)
RDB2(RXD2-)
RSA(RTS+)
RSB(RTS-)
CSA(CTS+)
CSB(CTS-)
SG
NC
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Shell
R+
R-
S+
S-
PLC side
GOT side
Receive data(+)
Receive data(-)
Send data(+)
Send data(-)
SDA
RDA
RSA
CSA
SG
SDB
RDB
RSB
CSB
FG
R+
S+
R-
S-
1
2
3
4
5
6
7
8
9
-
PLC side
GOT side
Receive data(+)
Send data(+)
Receive data(-)
Send data(-)
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......