74
SPECIFICATIONS
1.4.22 Maintenance timer alarm signal (Y95)
(common)
When the cumulative energization time of the inverter
reaches the parameter set time, the maintenance timer
output signal (Y95) is output.
(MT) is displayed on the
operation panel (FR-DU07).
This can be used as a guideline for the maintenance time
of peripheral devices.
The cumulative energization time of the inverter is stored
into the EEPROM every hour and indicated in [
Pr. 503
Maintenance timer
] in 100h increments. [
Pr. 503
] is clamped
at 9998 (999800h).
When the [
Pr. 503
] setting reaches the time set in [
Pr. 504
Maintenance timer alarm output set time
] (100h increments),
the maintenance timer alarm output signal (Y95) is output.
For the terminal used for the Y95 signal output, assign the
function by setting 95 (positive logic) or 195 (negative
logic) in any of [
Pr. 190 to Pr. 196 Output terminal function
selection
].
*1
The cumulative energization time is counted every hour.
The energization time of less than 1h is not counted.
common
[Pr. ]
Name
Initial
Value
Setting
Range
Description
503
Maintenance timer
0
0(1 to 9998)
Displays the cumulative energization time of the inverter in
100h increments.
Reading only
Writing the setting of 0 clears the cumulative energization
time.
504
Maintenance timer alarm
output set time
9999
0 to 9998
Set the time taken until when the maintenance timer alarm
output signal (Y95) is output.
9999
No function
First power
ON
Maintenance
timer [
Pr. 503
]
Set "0" in [
Pr.503
]
Y95 signal
MT display
OFF
ON
Time
ON
[
Pr.504
]
9998
(999800h)
Summary of Contents for FR-A700 Series
Page 245: ...279 2 PARAMETER PARAMETER MEMO ...
Page 440: ...474 PARAMETER MEMO ...
Page 522: ...556 SELECTION MEMO ...