![Mitsubishi Electric E1000 series Installation Manual Download Page 7](http://html.mh-extra.com/html/mitsubishi-electric/e1000-series/e1000-series_installation-manual_238470007.webp)
Installation
Mitsubishi Electric, MA00854
7
2
Installation
2.1 Space Requirements
– Installation plate thickness: 7.5 mm (0.29 - inch)
– Space requirements when installing the operator panel:
Caution
The openings on the enclosure are for air convection. Do not cover these
openings.
2.2 Installation Process
1. Unpack and check the delivery. If damage is found, notify the supplier
.
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
2. Place the panel cut out where the operator panel is to be situated, draw along the
outer sides of the holes and cut according to the markings.
100 mm
(4.0 inch)
50 mm
(2.0 inch)
155 mm
50 mm
(2.0 inch)
(6.10 inch)
100 mm
(4.0 inch)
155 mm
(6.10 inch)
44 mm
100 mm
(4.0 inch)
(1.73 inch)
x 6
Panel cut out 120 x 138 mm
(4.73 x 5.44 inch)
For text strip
9.0 mm
13.0 mm
(0.51 inch)
(0.35 inch)
Summary of Contents for E1000 series
Page 1: ...MITSUBISHI ELECTRIC E1022 Installation manual MA00854 2007 09 English ...
Page 4: ...Table of Contents Mitsubishi Electric MA00854 ...
Page 10: ...Installation 10 Mitsubishi Electric MA00854 ...
Page 12: ...Technical Data 12 Mitsubishi Electric MA00854 ...
Page 16: ...Chemical Resistance 16 Mitsubishi Electric MA00854 ...