14
EN
Specifications are subject to change without notice.
© 2022 Mitsubishi Electric US, Inc.
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
9
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
1:5
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
RUBBER PLUGS
PLASTIC TUBES
ENSURE TUBES DRAIN
INTO DRAIN PAN
Completed Step. 14b View
Horizontal Left Coil Assembly
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
9
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
Step.14c
Remove the rubber plugs indicated in the image above.
RUBBER
PLUGS
MOTOR
ON BOTTOM
SIDE DRAIN PAN
ON BOTTOM
REATTACH
BRACKETS
Step.15
Reinstall the coil assembly along with bracket(s) that
secure(s) it. Failure to reinstall the brackets will result in capacity loss
and condensation formation inside the cabinet. The wiring harness
for the LEV needs to be rerouted back into the electrical cabinet and
plugged into the
CN60
connector on the control board. The wiring
harness for the thermistor connector will also reroute into the electrical
section and plug into
CN44
. Refer to 9.3. Step 1 to 4 in reverse order
to reassemble the panels. Ensure the proper knockouts are removed
for drainage and electrical connections.
Caution:
For Horizontal installation an auxiliary drain pan must
be installed.
PA79D202H01
11
proper knockouts are removed for drainage and electrical
connections.
NOTE:
For Horizontal installation an auxiliary drain pan must be
installed.
9.D. Downflow Installations:
Downflow installation requires
various changes to the air handler from its original configuration.
There are
NO
additional kits or parts required in order to convert the
Air Handler to the downflow configuration.
Step. 1
Please refer to 5.C. Steps 1-4 for removing the panels which
cover the Electrical, Coil Assembly, Blower and Filter.
Step.2
A. Remove the Control box cover.
B. Unplug the LEV (CN60) and Thermistor (CN44) from the control
board and route the harness from control box area out through the
rubber grommet.
C. Remove the brackets which secure the coil assembly if not
already done.
D. Slide the coil assembly out of the air handler cabinet.
Step. 3
Rotate the cabinet so the Fan assembly is on top
Auxiliary
drain pan
A
B
C
MOTOR
ON BOTTOM
SIDE DRAIN PAN
ON BOTTOM
REATTACH
BRACKETS
PRIMARY DRAIN
3/4
”
FPT
AIRFLOW
Horizontal Left
Fan assembly rotation required
Step.14d
Next, install the clear plastic tubes which are included
in the accessory bag. Ensure the plastic tubes drain into the pan.
Also, be sure the clear plastic tubes do not have any restriction.
Cutting of the plastic tube is required, please refer to the table for
length. Finally, secure the clear plastic tubes to the top drain pan
per Detail A. Then to the metal brackets supporting the coil to the
top drain pan with the provided plastic ties as shown.
2 PLASTIC TIES
PER SIDE
2 PLASTIC TUBES
ENSURE TUBES
DRAIN INTO
DRAIN PAN
Model
Tube Length
PVFY-P08, 12, 18, 24
4.9 in. (125 mm)
PVFY-P30, 36
6.9 in. (175 mm)
PVFY-P48, 54
*8.9 in. (225 mm)
*Tube length provided.
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
18
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
5/8”
(15mm)
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
DETAIL B
PLASTIC TIE
PLASTIC TUBE
PLASTIC TIE
PLASTIC TUBE
CORRECT
INCORRECT
DETAIL B
DETAIL A
DETAIL A
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
9
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.