3. Installing the indoor unit
2) For right downward or left downward piping (Fig. 3-8)
(The following
fi
gure is a view of the bottom of the indoor unit from above.)
A
When the unit is installed on the wall.
B
When the unit is installed on the
fl
oor.
150
168
200
73
105
147
60
700
75
62
31
61
Fig. 3-8
60
19
60
19
60
60
Fig. 3-10
Fig. 3-9
2)
(mm)
4)
3)
3) For left piping (Fig. 3-9)
4) For right piping (Fig. 3-10)
3.4.3. Sealing the holes
Use putty or a caulking compound to seal the holes.
4. Refrigerant pipe
4.1. Connecting pipes (Fig. 4-1)
• When commercially available copper pipes are used, wrap liquid and gas pipes
with commercially available insulation materials (heat-resistant to 100°C or more,
thickness of 12 mm or more).
• The indoor parts of the drain pipe should be wrapped with polyethylene foam
insulation materials (speci
fi
c gravity of 0.03, thickness of 9 mm or more).
• Apply thin layer of refrigerant oil to pipe and joint seating surface before tightening
fl
are nut.
• Use two wrenches to tighten piping connections.
• Use refrigerant piping insulation provided to insulate indoor unit connections.
Insulate carefully.
Copper pipe O.D.
(mm)
Flare dimensions
øA dimensions (mm)
ø6.35
8.7 - 9.1
ø9.52
12.8 - 13.2
ø12.7
16.2 - 16.6
ø15.88
19.3 - 19.7
ø19.05
23.6 - 24.0
A
Flare cutting dimensions
90
°
±0.5°
øA
R0.4 ~ R0.8
45°±2°
Fig. 4-1
B
Refrigerant pipe sizes & Flare nut tightening torque
R407C or R22
R410A
Flare nut O.D.
Liquid pipe
Gas pipe
Liquid pipe
Gas pipe
Pipe size
(mm)
Tightening
torque
(N·m)
Pipe size
(mm)
Tightening
torque
(N·m)
Pipe size
(mm)
Tightening
torque
(N·m)
Pipe size
(mm)
Tightening
torque
(N·m)
Liquid pipe
(mm)
Gas pipe
(mm)
P20/25/32/40
O.D. ø6.35 (1/4”)
14 - 18
O.D. ø12.7 (1/2”)
49 - 61
O.D. ø6.35 (1/4”)
14 - 18
O.D. ø12.7 (1/2”)
49 - 61
17
26
C
Apply refrigerating machine oil over the entire
fl
are seat surface.
* Do not apply refrigerating machine oil to the screw portions. (This will make the
fl
are nuts more apt to loosen.)
D
Be certain to use the
fl
are nuts those are attached to the main unit. (Use of commercially-available products may result in cracking.)
Fig. 4-2
4.2. Refrigerant piping
4.2.1. Connecting pipe installation
Install the connecting pipes so that the piping can move slightly to the front, back,
left, and right. (Fig. 4-2)