5. SETTINGS AND PROCEDURES BEFORE OPERATION
5
−
2
MELSEC-A
5.1.2 DN91 start-up when setting parameters with the configuration software
Mount DN91 on the base unit, and power ON the unit.
(Set the CPU key switch to STOP, and do not connect the
DeviceNet cable.)
Prepare parameters with the configuration software.
Obtain EDS file for the slave station used from the manufacturer
of the station.
Power OFF the unit.
Copy the EDS file onto the EDS storage folder of the configuration
software. (If, for example, the software is installed in the folder
"Program Files" of drive C, copy the file onto C:/Program
Files/Hilscher GmbH/SyCon/Fieldbus/DEVNet/EDS.)
Write the parameters onto DN91.
Start
Power ON the DeviceNet network and slave stations.
Connect the DeviceNet network cable.
Write the parame-
ters onto DN91.
Modify the para-
meters with the
configuration soft-
ware.
Yes
No
"Communication
error code"
area = 0?
(Monitor the buffer memory
to check it.)
Develop a control sequence program.
Set the CPU key switch to RUN.
Write the control sequence program onto the PLC CPU.
Modify the cont-
rol sequence pro-
gram.
Operates normally?
No
Operation
Yes
Refer to Section 6.4.
Power ON the unit. (Set the CPU key switch to STOP.)