
2
INSTALLATION
1.3 General Precaution
The bus capacitor discharge time is 10 minutes. Before starting wiring or inspection, switch power off, wait for more than
10 minutes, and check for residual voltage between terminal P/+ and N/
−
with a meter etc., to avoid a hazard of electrical
shock.
1.4 Environment
Before installation, check that the environment meets following specifications.
햲
2.9m/s² or less for the 04320 or more.
Ambient temperature
-10°C to +50°C (non-freezing) for selected overload
capability 150 %, 200 % (initial setting) or 250 %
-10°C to +40°C (non-freezing) for selected overload
capability 120 %
Ambient humidity
90% RH or less (non-condensing)
Storage temperature
−
20°C to +65°C
Ambience
Indoors (No corrosive and flammable gases, oil mist, dust and dirt)
Altitude, vibration
Below 1000m, 5.9m/s
2
햲
or less
CAUTION
Install the inverter on a strong surface securely and vertically with bolts.
Leave enough clearances and take cooling measures.
Avoid places where the inverter is subjected to direct sunlight, high temperature and high humidity.
Install the inverter on a non-combustible surface.
Inverter
5 cm
5 cm
5 cm
Measurement
position
Measurement
position
Summary of Contents for 700 Series
Page 18: ...14 TROUBLESHOOTING ...