![MITECH SUPER200P User Manual Download Page 5](http://html.mh-extra.com/html/mitech/super200p/super200p_user-manual_1806992005.webp)
SUPER Series · User’s Manual
- 9 -
No.
Name
1
Collet
2
Ceramic Nozzle
3
Cap
4
Earth clamp
5
Argon welding torch
6
Gas-pressure Meter
7
Gas regulator
8
Gas Cylinder
9
Gas Hose
10
Ground Screw
11
Fan
12
Power cable
13
Power switch
SUPER Series · User’s Manual
- 6 -
INSTALLMENT & OPERATION
The welding machine is equipped with power voltage compensation device. When
power voltage fluctuates between ±15% of rated voltage, it can still work normally.
As using long cables, in order to reduce the voltage drop, cable of bigger section is
suggested. If cable is too long, it may affect the performance of the power system as
well as other properties, so we recommend you to use the configured length.
1. Be sure the vents are not blocked, lest cooling system will not work.
2. Well connect the protection gas source. Gas supply includes gas cylinder, argon
regulator and gas hose. Connecting part of gas hose should be fastened with hose
clamp to prevent from leaking gas or air admission.
3. Use inducting cable with the section not smaller than 6 mm² to connect the housing
to the ground. The way is from the ground-connecting screw to the earth device.