12
Remove the External Cap by pulling upwards on the handle of the External Cap to clear the rail guides
on the Rail Frame.
CPU Package is shipped from AMD factory with the blue Carrier Frame pre-assembled:
Upper picture -Top view showing the lid side of the Carrier Frame/CPU Package assembly.
Lower picture -Bottom view showing the land pad side of the Carrier Frame/CPU Package assembly.
Summary of Contents for E8020
Page 1: ...E8020 OCP Computing Sled User Manual Version 1 0 ...
Page 7: ...2 APPENDIX A 124 ...
Page 12: ...7 2 1 2 Ultra Note 4x U 2 drives One FHHL PCIe card ...
Page 32: ...27 B Push the Right Left handle bar to lock the Drive Cage ...
Page 33: ...28 C Insert the Riser Card ...
Page 34: ...29 D Fasten the latch to lock the riser card E Open the retainer as shown ...
Page 36: ...31 3 Mainboard Information 3 1 Board Introduction Here are different views of the main board ...
Page 39: ...34 3 4 Block Diagram ...
Page 47: ...42 CPU 0 Information ...
Page 50: ...45 4 3 4 Serial Port Console Redirection ...
Page 54: ...49 Console Redirection Settings COM1 ...
Page 62: ...57 4 3 7 USB Configuration ...
Page 73: ...68 Socket 0 Information View Information related to Socket 0 ...
Page 94: ...89 4 9 Save Exit ...