The following construction project information is required:
Construction
ex.: A14
Start
ex.: 3 km 500 m
Distance
ex.: 50 m
End
ex.: 5 km 550 m
Pos. of measuring sites
left, middle, right
Select layer and corresponding reflector
After data input, the measuring site plan is generated automatically
under “Generate measurement plan” s. Fig. 42). Individual data sets
can be processed or deleted there.
Hint:
If large changes to a
measurement plan are
required, it is recommended
to set up a new plan with the
necessary corrections!
Fig. 42 Generated measuring site plan with USB flash drive data