background image

Operation & Maintenance Manual 

ATL-M001-A2

  

3

 

 

 

 4.0 Operation 

 
 

 

 

 

WARNING  

 

Internal maintenance must be 
performed with a transformer de-
energized, isolated and with the 
terminals grounded. 

 

 

Caution:

 

Do not remove covers, panels, or any 

enclosure parts while the

 

AUTOTRANS

L

INEATOR

 

is 

energized. 
 

4.1 Effect of Humidity 

 

While the

 

AUTOTRANS

L

INEATOR

 

is energized, 

humidity conditions are generally not important 
since the heat from the reactor will prevent 
condensation. If a shutdown exceeding 24 hours 
occurs during a period of high humidity that could 
cause condensation within the transformer, 
precautions should be taken. Small strip heaters 
may be energized in the bottom of the unit to 
maintain the temperature of the unit a few degrees 
above that of the outside air. If such precautions 
are not taken the unit should be inspected for 
evidence of moisture and insulation resistance 
checked. If necessary, dry as described in 
Maintenance section above.

  

 

4.2 Loading 

 

A

 

AUTOTRANS

L

INEATOR

 

should only be loaded in 

accordance with its nameplate rating. 

 

Summary of Contents for AUTOTRANSLINEATOR

Page 1: ...MIRUS International Inc INSTALLATION OPERATION AND MAINTENANCE GUIDE AUTOTRANSLINEATOR AUTOTRANSFORMER AND UNIVERSAL HARMONIC FILTER ATL M001 A2...

Page 2: ...d maintenance of the AutoTransLineatorTM and its auxiliary equipment WARNING OPENING ENCLOSURES EXPOSES HAZARDOUS VOLTAGES ALWAYS REFER SERVICE TO QUALIFIED PERSONNEL ONLY WARNING As standards specifi...

Page 3: ...TION OPERATION AND MAINTENANCE GUIDE ATL M001 A2 3 Feb 2010 MIRUS International Inc 31 Sun Pac Blvd Brampton Ontario Canada L6S 5P6 1 888 TO MIRUS 1 888 866 4787 Tel 905 494 1120 Fax 905 494 1140 E Ma...

Page 4: ...warranty period and obtain a written return material authorization an RMA from MIRUS The Customer must return the defective unit to MIRUS freight prepaid within sixty 60 days of receipt of the RMA an...

Page 5: ...Page 1 0 Installation 1 1 1 Location 1 1 2 Inspection 1 1 3 Handling 1 1 4 Grounding 1 2 0 Storage 1 3 0 Maintenance 2 3 1 Periodic Inspection and Maintenance 2 3 2 Cleaning 2 3 3 Drying of Core and...

Page 6: ...AUTOTRANSLINEATOR vi ATL M001 A2...

Page 7: ...spection should be conducted with emphasis on loose or broken connections damaged or displaced parts cracked insulators dirt or foreign material or evidence of moisture 1 3 Handling The AUTOTRANSLINEA...

Page 8: ...uld be conducted annually or whenever the unit seems to be operating in an abnormal manner 3 2 Cleaning Excessive accumulations of dirt on the transformer windings or insulators and capacitor terminal...

Page 9: ...e reactor will prevent condensation If a shutdown exceeding 24 hours occurs during a period of high humidity that could cause condensation within the transformer precautions should be taken Small stri...

Page 10: ...AUTOTRANSLINEATOR 4 ATL M001 A2 NOTES...

Page 11: ...Operation Maintenance Manual ATL M001 A2 5...

Page 12: ...US International Inc 31 Sun Pac Blvd Brampton Ontario Canada L6S 5P6 1 888 TO MIRUS 1 888 866 4787 Tel 905 494 1120 Fax 905 494 1140 E Mail mirus mirusinternational com Website www mirusinternational...

Reviews: