![Mira Mira Activate Ceiling Fed (High Pressure) 1.1903.086 Installation And User Manual Download Page 39](http://html1.mh-extra.com/html/mira/mira-activate-ceiling-fed-high-pressure-1-1903-086/mira-activate-ceiling-fed-high-pressure-1-1903-086_installation-and-user-manual_1804958039.webp)
39
Pump Commissioning.
The product will then commission the pump. Wait for this to be completed. A noisy
pump is OK, but is indicative of a lack of water – this may suggest supply issues. The
product will indicate when the process is complete. Press ‘Done’ to move on.
Failed Commissioning.
If commissioning has failed, the product will indicate this.
Review the installation and retry.
Recommissioning.
If recommissioning is required at any point in the future, this can be completed using
the Mira Showers app.
6
7
8
Commisioning
is now
complete
Done
Commisioning
is now in
progress
Please wait
Cancel
Commisioning
failed.
Please check
inlet pipework
and retry
Retry