- 18 -
A-1C A-2C Operation Procedure
1. Lubricator – Make sure that the lubricator is full. See recommended lubricants.
2. Air Supply – Use a 3/4” hose to supply air to the drill unit.
3. Install the drill steel and bit into the drill.
4. Make sure that the air compressor is on.
5. Position the drill where the first hole is to be drilled and set the brake.
6. Remove the rail locking pin.
7. Lower the rail to the horizontal drilling position.
8. Make sure the rub strip is against the slab.
9. Using the feed control valve, feed the bit against the slab.
10. Using the drill control valve, turn the drill on and drill until the stop rod is against the stop pad.
11. Using the drill control valve, turn the drill off and then using the feed control valve, retract the drill from the hole.
NOTE: If the bit will not retract from the hole, feed the drill back into the hole and turn the drill on. With the drill
running use the feed control valve and retract the drill. Immediately shut the drill off one the bit is clear of the hole.
DO NOT HIT THE DRILL SLIDER TO RETRACT THE BIT FROM THE HOLE. THIS WILL DAMAGE THE
SLIDER!
12. Once the hole is drilled, disengage the brake and move the unit to the next hole location, engage the brake, and
then repeat steps 8 – 11.
Summary of Contents for A-1C
Page 11: ...11 012287 00005 012287 00010 012287 00007...
Page 13: ...13 012287 00005 012287 00010 012287 00007 012287 00008...
Page 19: ...19...
Page 22: ...22...
Page 24: ...24...
Page 26: ...26...
Page 28: ...28...
Page 30: ...30...
Page 32: ...32...
Page 34: ...34...
Page 36: ...36...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 42: ...42...
Page 46: ...46...
Page 48: ...48 AIR SCHEMATIC A 1C...
Page 49: ...49...
Page 50: ...50...
Page 52: ...52...
Page 56: ...56...
Page 57: ...57...
Page 58: ...58...
Page 59: ...59...
Page 60: ...60...
Page 65: ...65...