0060-1
0067
0067
0060-1
134-128
134-62
128-80
Hardware for this
assembly
127(&DUHIXOO\JOXHEHDULQJDVVHPEOLHVWRWRUTXHWXEHPDNLQJVXUHEHDULQJORFDWLRQVDUH127HTXDOGLV
-
tances from torque tub ends. Allow Loctite 648 to dry (about 2 hours) before installing into tail boom.
Hardware for this
assembly
Assembly Tips
(QVXUHWKDWWKHERRPLVIXOOLQVHUWHG
through boom clamps.
'RQRWRYHUWLJKWHQ0$6RFNHW
Bolts as it is possible to crush tail
boom.
134-58
0049-1
0015
End of the boom with the
3mm hole 1mm from the
end of the boom
Apply a small amount of
medium thread lock when
threading into metal parts
[
0[6RFNHW%ROW
[
0[6RFNHW%ROW
[
0[6RFNHW%ROW
[
PP+H[1XW
8VHRQO\/RFWLWHJUHHQWRJOXH
TT ends to tube.
'RQRWRYHUWLJKWHQVRFNHW
bolts as it is possible to crush
torque tube.
2-B-2
131-400
128-80
2-B-3
Apply Loctite 648 at the
torque tube and at the TT
end 131-400 when assem-
bling these parts.
Use Loctite 243 to secure M2
screw and nut
Assembly Tip
16
I n s t a l l
from
t a i l
s i d e towards
f r o n t
o t h e l i .
u s e
soap
t o
a l l o w
boom
clamps
t o
s l i d e