![Minebea Intec PR 6207 Installation Manual Download Page 17](http://html.mh-extra.com/html/minebea-intec/pr-6207/pr-6207_installation-manual_1801147017.webp)
No.
Description
1
Base plate
2
M6 locking screw
3
M6 nut
4
Benchtop
5
Flexible copper strap
7
Steel cable
9
M8 nut
10
Cotter pin 2×16
11
Conical seat
12
Rounded washer
13
M8 crown nut
14
M8 nut
15
M8×35 screw
16
B8.4 spring washer
17
8.4 washer
18
Dust cover
19
M6×10 screw
20
B6.2 spring washer
5.3.2
Assembly
Note:
Positions, see Chapter
Fine adjustment of the overload protection is performed after installation (see
Chapter
).
Make sure that the load application borehole of the load cell aligns with the cable
grommet borehole.
For security reasons, the base plate must be screwed on with four screws through the
boreholes provided!
1. Screw overload protection (2, 3) up to where X = 19.6 mm, i.e.the locking screw must
not touch the load cell nor protrude from below the base plate (1).
2. Clean all supporting surfaces of benchtop (4) and load cell and replace the load cell
according to the load direction (arrow on the face of the load cell).
3. Tighten the screws and (15) with spring washer (16) and washer (17) with a wrench
(torque approx. 2.5 kN) and attach and screw on protective cover (19, 20).
4. Make sure that the contact surface of the support structure is clean, lat and level (use
a spirit level).
5. Only then screw on the base plate (1) of the PR 6007/00 with the support structure.
5 Installation
Beam Type Load Cell PR 6207
Minebea Intec
EN-15
Summary of Contents for PR 6207
Page 21: ...6 Connection Beam Type Load Cell PR 6207 Minebea Intec EN 19 ...
Page 29: ......
Page 30: ......
Page 31: ...1 6 ...
Page 32: ...2 6 ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......