background image

2. Install the Main Unit 

4. Install the CO2 Absorbent Canister

3. Install the Breathing Circuit (Veta 5 Only)

1. Install the Trolley

Main unit 
supporting 
board

Veta 3/Veta 5 Installation Guide

                                                      

                                                      

Insert the column into the trolley base; then, put the trolley down and tighten the screws.

Lock four casters of the trolley. Then, place the main unit securely on the trolley by aligning 
three positioning columns under the main unit with three locating pins on the trolley, and 
tighten screws.

a. Align the guiding post slots of the breathing system with the guiding post of the main unit 
circuit connector, and fix the breathing circuit with screws. 
b. Fix the fastener under the supporting board and insert the inner hexagon spanner into it.
c. Insert the microswitch cable plug into the slot.

Rotate the CO2 absorbent canister counterclockwise to fix it.

5. Install the Bellows (Veta 5 Only)

Tools:

 

M8X25 screws:4

 

Inner hexagon spanner

Column

Tools:

 

M8X25 screws:4

 

Inner hexagon spanner

Positioning column

Microswitch 
cable plug

Screws

Screws

Screws

Check the 
connector for 
absorbent 
particles.

6. Install the Basket

Hang the basket on the handrail of the machine directly or install it on the column.

Screws

Inner hexagon spanner

a. Attach the bottom ring of the bellows to the bellows base and ensure that the bellows is 
tightly connected to the base.
b. Align the bellows housing bayonet with the slots, and rotate it clockwise firmly.

Tools:

 

M8X25 screws:3

 

Inner hexagon spanner

Tools:

 

M4X12 screws:4

 

Phillips screwdriver

Reviews: