background image

Screws

9. Install the Anesthesia Gas Filter Canister

8. Install the Tray or Weigher (Optional)

10. Connect the AGSS System or Passive Scavenging Pipe (Optional)

a. Place the anesthesia gas filter canister (self-prepared) on the weigher or the tray by 
aligning the groove.
b. Use the silicone tube to connect the gas filter canister with the AGSS inlet pipeline 
connector.

AGSS inlet pipeline connector 

Silicone tube

Anesthesia gas filter 
canister 

AGSS support rail

Stop pin

AGSS gas supply 
hose

ools:

 

M4X12 screws:2

 

Phillips screwdriver

7. Install the Oxygen Generator Tray and Connector (Optional)

a. Fix the oxygen generator tray assembly to the column and trolley by using screws and the 
fixing plate respectively.
b. Rotate the oxygen generator connector clockwise into the gas supply inlet and connect the 
oxygen generator with a tube.

Tray assembly

a. Insert the tray or weigher (Veta 5 Only) into the screw arbor and tighten the screws.
b. Connect the weigher cable with the communication interface (SP).
c. Use three silicon plugs to attach the cable to the column and fix the cable on the back of 
the machine.

Knob

a. Rotate the two stop pins into the AGSS support rail and fix the AGSS support rail into the 
side of column with screws. 
b. Insert the AGSS assembly into the AGSS support rail and rotate the knob tightly. Use the 
AGSS gas supply hose to connect the waste gas outlet with the AGSS assembly inlet. 
c. Connect the waste gas outlet with the passive scavenging pipe when using the passive 
scavenging method.

Passive scavenging pipe

Veta 3/Veta 5 Installation Guide

                                                      

                                                      

Screws

Tools:

 

M4X12 screws:6

 

Phillips screwdriver

Tools:

 

M4X12 screws:4

 

Phillips screwdriver

0 4 6 - 0 2 2 5 1 5 - 0 0 ( 1 . 0 )

Reviews: