![Mindra HK-D07-230-NE1 User Manual Download Page 18](http://html1.mh-extra.com/html/mindra/hk-d07-230-ne1/hk-d07-230-ne1_user-manual_1800758018.webp)
Type 2 AC EV charger Instructions-
V1.1.0
12
reduce user fatigue.
➢
Before the installation, the charger shall be fixed on the special installation plate of with screws. Then
fix the installation panel on the wall with expansion bolts conforming to specifications. Specific screw
and expansion bolt size should be selected according to charger installation size and site requirements.
➢
When the charger installed, charger after sale service and maintenance shall be fully considered.
Note: This installation method is for reference only. The corresponding installation method shall be selected
according to the actual situation on site. Please refer to the detailed construction instructions.
(
2
)
For the wall-mounted AC charger with supporter, the installation size and foundation construction are
shown in Figure 7.2.2, 7.2.3 and chart 7.2.2 below:
Figure 7.2.2 charging post installation drawing
Figure 7.2.3 Construction Drawing
Power
line
inletting hole
Concrete base
200MM higher
4-M12*150 Expansion Screw
Right
Left
Front
Back