DISCLAIMER NOTICE: If the prescribed method of installation is not followed
precisely, the foot rest ledge may detach from the wall and cause damage to the
panels and the walls. If the foot rest ledge detaches, physical injury to the
occupant of the shower may occur. Mincey Marble will not be liable for any
damages to persons or property because of incorrect installation.
The foot rest ledge will come with pre-cut slots in the integral support, which will slide over the
truss screws in the walls. It is very important to pre-drill the holes for the truss screws into the
cast marble panels before driving the truss screws into the wood blocking, in order to avoid
damaging the cast marble panels. The integral support of the foot rest ledge has a short side
and a long side. The short side of the foot rest ledge will be installed onto the back wall and the
long side will be on the end wall of the enclosure.
Installing the Foot Rest Ledge with wood blocking:
1. Measure the locations of the slots on the back of the foot rest ledge and transfer these
dimensions to the cast marble panels in the corner of the shower enclosure where the
foot rest ledge is to be installed.
See illustration (1).
The top of the foot rest ledge,
once installed, must be even with the top of the 1-
1/2” band of the cast marble
panels. The correct location of the drilled holes is critical in order to maintain
alignment of the foot rest ledge to this band. See illustration (2).
ILLUSTRATION 1:
ILLUSTRATION 2: