
Basic Operation
47
M400-020A-K6
Basic Operation
Power setting
Here will describe the sequence of power on.
You should avoid the noise caused by other machine like electric generator
and welding machine.
※
Notice
1.
Making sure to put M400 Series at a level palce, no shocking
2.
Using dedicated plug seat as AC power
3.
Recommended using 3P plug seat which contains GND
4.
Making sure the power switch are off, then connect the power cable to plug seat.
5.
No IC and Adapter inserting the programmer while power on. (Avoiding be
damaged)
Power on sequence
①
Making sure no IC is in the SOCKET, then turn the power switch to on.
②
About 1 minute later the status LED will turn green and it’s ready for connecting to
PC.
③
Click the icon of M400 control software. Normally choose
[
Connect
]
to
automatically connect to PC.
④
The IC which is selected last time will be called out automatically on the basic
screen.
⑤
Basic Screen