![Milnor PulseFlow 76028 G3 Installation And Service Download Page 38](http://html1.mh-extra.com/html/milnor/pulseflow-76028-g3/pulseflow-76028-g3_installation-and-service_1797140038.webp)
Connecting Ancillary Equipment and Services
PELLERIN MILNOR CORPORATION
Each tunnel module is provided with a vent at the top of the shell. These vents are capped at the
factory for shipping.
Uncap all vents at installation.
The best practice is to provide two separate,
powered ventilation units that meet the following conditions:
• The two units are isolated from each other to avoid harmful chemical reactions.
• Ventilation fans have sufficient power to draw vapors away from the equipment. Milnor
recommends 600 to 750 SCFM for the oxidation zone (300 to 375 per connection point, if
two modules) and 600 to 750 SCFM for the finish zone plus the press enclosure (200 to 250
SCFM per connection point, if two modules plus the press). The SCFM values are based on
an ambient air temperature of 68°F (20°C) and a minimal relative humidity.
• Fan motors are equipped with an alarm (example: indicator light) to alert personnel if a motor
fails.
shows the recommended configuration for a tunnel with more than seven modules.
Smaller tunnels are similar, but consult the Milnor factory.
Figure 1: Recommended Vent System for the CBW
®
Tunnel Washer and an Adjacent Press
Side View (cut lines indicate a tunnel larger than 7 modules)
Legend
Op.
Open vent (not piped)
Pt.
Powered vent on module
B.
Oxidation zone per chemical supplier
F.
Finish zone
Pp.
Powered vent on press equipped to vent vapors
.
It is not recommended to connect modules ahead of the oxidation zone to a powered vent system.
However, if conditions warrent this, Milnor recommends the configuration shown in
. If
this configuration is needed, add 200 to 250 SCFM of powered ventilation per additional module
vented.
32
Summary of Contents for PulseFlow 76028 G3
Page 2: ......
Page 6: ......
Page 10: ......
Page 11: ...Safety and Maintenance 1 5 ...
Page 59: ...Installation 2 53 ...
Page 63: ...Parts and Assemblies 3 57 ...
Page 64: ......
Page 65: ...3 Covers and Shipping Brackets 3 1 59 ...
Page 69: ...3 Drive Assemblies 3 2 63 ...
Page 92: ...4bYfU DbQY CUbfYSU 5 5B9 9 B 3 B B1D9 Figure 7 Support Wheel Tracking End of BIPCLM02 86 ...
Page 99: ...3 Load Chute and Seals 3 3 93 ...
Page 109: ...3 Water Steam and Peristaltic 3 4 103 ...
Page 160: ......
Page 161: ...3 Pneumatics 3 5 155 ...
Page 163: ...Dimensional Drawings 4 157 ...
Page 164: ......
Page 165: ...159 ...
Page 166: ...160 ...
Page 167: ...161 ...
Page 168: ...162 ...
Page 169: ...163 ...
Page 170: ......
Page 171: ...165 ...
Page 172: ......
Page 173: ...167 ...
Page 174: ......
Page 175: ...169 ...
Page 176: ......
Page 177: ...171 ...
Page 178: ...172 ...
Page 179: ...173 ...
Page 180: ...174 ...
Page 181: ...175 ...
Page 182: ...176 ...
Page 183: ...177 ...
Page 184: ......
Page 185: ...179 ...
Page 186: ......
Page 187: ...181 ...
Page 188: ......
Page 189: ...183 ...
Page 190: ......
Page 191: ...185 ...
Page 192: ......
Page 193: ...187 ...
Page 194: ...188 ...
Page 195: ...189 ...
Page 196: ...190 ...
Page 197: ...191 ...
Page 198: ......
Page 199: ...193 ...