3.4.
Dribbling: Locate the entire chemical line below the machine inlet.
—
Assuming the chemical system does not retain any line pressure and that the pump provides
positive closure when the system is off, locate the entire chemical delivery line below the level of
the chemical inlet. An example of this is shown in Figure 4.
Figure 4:
Locating a Pumped Chemical System With Positive
Closure To Protect Against Machine Damage
Example of Correct Placement
Legend
I.
Chemical inlet on
machine
L.
Chemical delivery line
P.
Pump with positive
closure when system is
off
T.
Chemical tank
4.
Guarding Against Leaks
All personnel who may work with the chemical system (e.g., chemical system manufacturer,
chemical system supplier, chemical supplier, operator, maintenance personnel) should be vigilant
in observing for leaks in the system. When connecting, or reconnecting chemical lines, whether at
installation, after taking samples, or when replacing components, at a minimum ensure that:
1. the proper components are used,
2. all connections are the proper fit, and
3. all components are securely connected.
CAUTION 2 : Injury and Damage Hazards
—Chemicals leaking from a chemical system
may be corrosive or toxic. Such chemicals can injure personnel and damage equipment.
• Use care when connecting chemical lines.
• Inspect regularly for leaks.
— End of BIWUUI03 —
20
Summary of Contents for 36030
Page 4: ......
Page 25: ...Section 1 Installation 21 ...
Page 32: ...28 ...
Page 33: ...Section 2 Dimensional Drawings 29 ...
Page 34: ...30 ...
Page 35: ...31 ...
Page 36: ...32 ...
Page 37: ...33 ...
Page 38: ...34 ...
Page 39: ...35 ...
Page 40: ...36 ...
Page 41: ...37 ...
Page 42: ...38 ...
Page 43: ...39 ...
Page 44: ...40 ...
Page 45: ...41 ...
Page 46: ...42 ...
Page 47: ...43 ...
Page 48: ...44 ...
Page 49: ...45 ...