
MANUAL DE UTILIZAÇÃO |
BALANÇO HIDRÁULICO
110
www.mills.com.br
X
►
SECONDARY BEAMWORK
Your spacing should be
set regarding the acting
loads and according to the
resistance of the beam
bottom mold.
SECONDARY BEAMWORK
Knowing how the mold shall be structured before
starting the propping design it is possible to anticipate
the secondary beamwork spacing.
SPACING
Pay attention to the
secondary beamwork
spacing.
Summary of Contents for TS MILLS
Page 1: ...TS MILLS USE MANUAL Infrastructure...
Page 2: ...USE MANUAL TSMILLS...
Page 4: ......
Page 5: ......
Page 10: ......
Page 137: ......
Page 138: ...NATIONAL ENGINEERING...