
OM-180 231 Page 4
SECTION 3 − INSTALLATION
3-1.
Connections
801 190-D / 801 191-D
!
Turn off power and disconnect
cooler plug.
!
Install customer supplied power
plug and receptacle according to
all national, state, and local codes
1
Lift -Eye
If placing cooling unit on welding power
source, slots are provided in bottom of
unit so it fits over lift-eye.
To prevent overheating, make sure cool-
ing unit is positioned so airflow is not re-
stricted.
NOTICE − If welding power source has
a water valve, do not connect hoses to
water valve. Connect hoses as shown.
2
Coolant Out Hose
3
Coolant In Hose
4
Coolant Tank Cap
Fill tank with coolant. Use table in Section
2-3 to select proper coolant. Keep cool-
ant level full.
5
Flow Indicator
6
Power Switch
Use switch to turn cooler on and off.
7
Input power cord.
Customer to supply and install correct in-
put power plug and matching receptacle.
Operation:
Turn power switch On. Flow indicator
spins to indicate that at least 0.53 qt/min
(0.5 L/min) of coolant is flowing.
GTAW Connections
GMAW Connections
1
Tools Needed:
5/8 in.
2
3
4
5
6
7
Summary of Contents for PU 301
Page 4: ......
Page 11: ...OM 180 231 Page 7 Notes...
Page 14: ...TM 216 869 Page 10 Dynasty 350 700 Maxstar 350 700 Notes...
Page 15: ...Notes...