OM-403 Page 8
SECTION 3 – INSTALLATION
3-1.
Installing Welding Generator
install1 3/96 – Ref. ST-800 652 / Ref. ST-800 477-A / ST-158 936-A / S-0854
1
2
Electrically bond generator frame to
vehicle frame by metal-to-metal
contact.
GND/PE
3
4
1
Generator Base
2
Metal Vehicle Frame
3
Equipment Grounding
Terminal
4
Grounding Cable
Use #10 AWG or larger insulated
copper wire.
Y
If unit does not have GFCI re-
ceptacles, use GFCI-
protected extension cord.
2
OR
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
OR
Movement
Airflow Clearance
Location
Grounding
OR
Y
Do Not Lift Unit From End
3-2.
Dimensions, Weights, And Operating Angles
A
Dimensions
B
C
Height
31 in (787 mm)
Y
D
Width
18-3/4 in (476 mm)
Y
Do not exceed operating angles while run-
ning or engine damage will occur.
Y
Do not move or operate unit where it could
4 Holes
G
Depth
46 in (1164 mm)
Y
Do not move or operate unit where it could
tip.
E
A
18 in (457 mm)
°
E
F
B
16-1/2 in (419 mm)
25
°
°
°
C
3/4 in (19 mm)
25
°
25
°
25
°
D
3-1/8 in (79 mm)
angles1 3/96
E
32-3/4 in (832 mm)
Weight
Engine End
F
45-1/2 in (1156 mm)
Net: 575 lb (261 kg)
ST-800 426
G
13/32 in (10 mm) Dia.
Ship: 599 lb (272 kg)