MCB1X2U / LCB1X2U
Installation Instructions
6
INSTALLATION
IMPORTANT ! :
Refer to
Dimensions
section (and to
Dimensions
section in the MCB1U/LCB1U installation
instructions) to find specific dimension requirements
BEFORE
proceeding with installation.
NOTE:
The following procedure assumes that a UL Listed
Chief CPA or CMA ceiling plate (not included) has been
properly installed following instructions included with
ceiling plate.
Installing Column
1.
Lay CPA048P column (A) on floor and carefully place
displays next to column. (See Figure 1)
2.
Mark center of lower display onto column. (See Figure 1)
3.
Measure one screen height up on the column from the first
mark. Add approximately 2 inches extra length to allow for
display tilt, and add additional length for any extra space
desired between displays. (See Figure 1)
4.
Mark center of upper display onto column. (See Figure 1)
Figure 1
5.
Install column following instructions included with column.
Installing MCB1U / LCB1U
1.
Install MCB1U / LCB1U mounts (B) onto column following
instructions included with MCB1U/LCB1U.
IMPORTANT ! :
Match the center marks on the MCB1U/
LCB1U mounts with the marks on the column. (See
Figure 2)
Figure 2
2.
Complete installation following instructions included with
MCB1U/LCB1U.
3
2
Cent
er
of
di
spl
ay
4
(A)
Center mark
(both sides of mount)
(MCB1U shown as example)