background image

 

 

Milandr, Inc. 

Milur 107 Operation Manual 

 

Operational Manual for Milur 107 Smart Meter 

          Page 8 of 16 

 

 

 

 

 

 

 

MILUR

 

107

 

SMART

 

ELECTRIC

 

METER 

Manual Operation  

Summary 

 

Information from the Meter can be read both in manual control mode 

and remotely, through any of the available interfaces. The displayed 

options are grouped into 4 cycles. Switching between options in the cycle 

is made by short pressing the button "Option". When Pressing the 

"Menu" button switches between cycles. If not Press the buttons for one 

minute, the meter automatically switches to the first display cycle (user 

menu), and the external Meter display unit installation is completely 

turned off, it is switched on for a short time by pressing one of the 

buttons.  

Upon power-up, the meter measures the power, determines the tariff 

number according to the tariff schedule of the current (or holiday) day of 

the week, starts to register energy in the current tariff and is set in the 

first cycle display (user menu).

 

First Display Cycle (User 
Menu) 

 

In the user menu on the Meter indicator is cyclically displayed 

(depending on the screens included):  

 

 

Total consumption of active energy for all tariffs; 

 

Consumption of active energy at tariffs 1, 2, 3, 4; 

 

Active power;  

 

Voltage of the network;  

 

Current;  

 

The current date;  

 

Current time; is the frequency of the network.  

 

If there is a load, the LED indicators flash periodically. 

 

The duration of each option indication is 10 s by default. Display 

time can be changed programmatically. The amount of energy 

consumption is presented in the format ХХХХХX.ХX,  

Where: ХХХХХX.ХX – is the value (000000.00…999999.99).  

 

 

Summary of Contents for MILUR 107

Page 1: ...lation Usage technical information and maintenance The Instruction Manual Contains Description of the Meter and its components Technical Specifications and other information necessary to ensure capabi...

Page 2: ...CONTENTS 1 Product Description 2 Technical Details 3 Safety Information 4 Conditions of Use 5 Environmental Considerations 6 Installation Procedure 7 Manual Operation 8 Remote Operation 9 Measures to...

Page 3: ...Meter with reduced terminal covers requires additional protection from direct water ingress The measuring unit of the outdoor meter has an IP20 degree of protection The Meter is intended for the orga...

Page 4: ...ve energy reactive energy 0 02 0 025 Operating Temperature range F indoor Installation outdoor Installation 40 to 158 58 to 158 Number of tariffs Up to 4 Accuracy of the build in clock with the meter...

Page 5: ...y additional installation or maintenance questions The detailed specifications installation and programming instructions are available online at www milur com Conditions of Use 1 The voltage applied t...

Page 6: ...connect the voltage and current circuits in accordance with the scheme shown on the protective cover 4 Connecting the internal installation meter to the mains produce through a switch located in the i...

Page 7: ...e sure that the meter has turned on On the meter s display the active energy consumption instantaneous values of current capacity network voltage current time and date are displayed If there is a load...

Page 8: ...e by pressing one of the buttons Upon power up the meter measures the power determines the tariff number according to the tariff schedule of the current or holiday day of the week starts to register e...

Page 9: ...mm ss Where hh hours 00 23 minutes 00 59 ss seconds 00 59 When time is displayed the word time is displayed on the screen The power value is displayed in the following format X X Where XXXXXX XX is th...

Page 10: ...in the LCD display Third Display Cycle The following options are displayed in the third display cycle Instantaneous value of active power Instantaneous reactive power Instantaneous full power Instanta...

Page 11: ...the displayed voltage value is Volt In this case the indicator on the LCD displays the V and P1 symbols The network address of the Meter is displayed in the format P2 Where XXX is a byte decimal numbe...

Page 12: ...Meter is established after specifying the corresponding fields of the Meter address program access level password level access and the number of the virtual COM port on which the converter was instal...

Page 13: ...ck time is programmable through available interfaces Each Meter is given the following default passwords and addresses The password of the first level FF FF FF FF FF FF 255 255 255 255 255 255 The pas...

Page 14: ...ontrol To perform this function the impulse output of active energy can be transferred to three additional modes load on load off and automatic control When the load on function is selected the pulse...

Page 15: ...from the meter surface by a clean soft wipe rag To check the reliability of the power and interface circuits of the meter you need to Remove the seals from the protective covers of the terminal block...

Page 16: ...C16 To verify the integrity of the software and its compliance it is provided a unique identification Identification is carried out by an external Milur Meter Configurator software via communication i...

Reviews: