
6
|
MIJAR
–
WATER TREATMENT |
| Azotowa 15b | 41-
503 Chorzów |
Poland | Tel./fax. 32 2899674 | email: [email protected] | www.mijar.eu |
1.3.
Control function
Steering Valve
Before launching the current time should be set and the number of m
3
to flow after which the regeneration is to
start.
Valve is pre-set for intelligent regeneration (down-flow) A-03
The drive is preset for the regeneration at 2 a.m. every 975 liters (0,975 m
3
) for the water hardness of 20 GH
German degrees. Depending on the water hardness set the appropriate number of liters to flow after which the
regeneration is to start and set the regeneration time.
Control system (treated water hardness)
If the soft water is set to a specified hardness level, higher than 1 °dH, the
bypass adjusting bolt must be
properly opened (see figure on page 7).
By turning a screwdriver counter clockwise increase the amount of tap
water in the soft water. Check the water hardness in the regulated soft water.
2.
Preparation for installation
2.1.
Installation preparation plan
Picture 1.
On the purchaser’s
side:
1.
Utility water
supply pipe
(cold)
3
/4” with a cut off
valve.
2.
Drainage
(sewer)
at a max. height of
100 mm,
connection DN
50.
3.
Electric socket
230 V / 50 Hz, 16
A
4.
Floor drainage
must be in the
room.
5.
Sediment filter
must be use
before water
softener
2.2.
Dismantling and utilization
The device is dismantled after it lifetime has expired (for final destruction or scrap).
The reversed assembly steps are to be commenced.
Note!
First clean the system thoroughly with fresh water and drain the tanks and pipes completely!
Comply with workplace safety instructions in this respect!
Different parts of the device must be utilized in accordance with binding regulations of
utilization and waste management!