background image

59

Summary of Contents for QE-431

Page 1: ...o operate each tool 4 Clean the hose with a blast of compressed air before connecting the hose to the air tool This will prevent both moisture and dust inside the hose from entering the tool and causi...

Page 2: ...t pipe is recommended on the specification table The diameter B required for the branch pipe from to should be 2 times as large as A B 2 x A The diameter C required for the primary air supply from to...

Page 3: ...tool because it may create a hazard at the moment when the drill bit breaks through the workpiece 11 Note that high reaction torque may develop due to drill bit stalling This may happen when drilling...

Page 4: ...hours of operation 3 Do not lubricate tools with flammable or volatile liquids Use only the lubricant recommended by Mighty Seven or authorized dealers Any other lubricant will lead to reduce perform...

Page 5: ...resseur 3 Utilisez un compresseur avec une capacit adapt e pour chaque outil 4 Nettoyez le tuyau d alimentation avec une d charge d air avant chaque utilisation Ceci vitera que de l humidit et ou des...

Page 6: ...equis pour le tuyau d arriv e de doit tre gal deux fois celui de A B 2 x A Le diam tre C requis pour le tuyau de distribution de doit tre gale trois fois celui de A C 3 x A La longueur du tuyau d alim...

Page 7: ...ur l outil car cela pourrait faire basculer le plan de travail lorsque la m che passe travers la pi ce percer 11 Un couple r actif lev peut survenir lorsque la m che bloque ou lorsque la m che passe t...

Page 8: ...on 3 Ne pas lubrifier l outil avec des produits volatile ou inflammable Seule l utilisation de lubrifiants recommand s par M7 ou un revendeur autoris est permise Tout autre lubrifiant peut r duire la...

Page 9: ...erh htem Materialverschlei f hren kann 2 Die Druckluftzufuhr soll durch den in der Anlage eingebauten Lufttrockner abgek hlt werden und am Druckluftabgang durch den installierten Filter gefiltert wer...

Page 10: ...uhrleitung ist in einer Tabelle auf der n chsten Seite vermerkt Der Durchmesser des Rohrabzweigs B von bis soll doppelt so gro wie A sein Also B 2 x A Der Durchmesser der Druckluftversorgungleitung C...

Page 11: ...nach sich ziehen k nnte 11 Achtung Starke Gegenkraft beim Bohren kann den Bohrer abrei en Dies geschieht beim Bohren in das Material oder wenn der Bohrer gerade das Material durchbricht 12 Achten Sie...

Page 12: ...weils nach einer 3 oder 4 st ndigen Benutzung mit Schmier l gewartet werden 3 Bitte verwenden Sie auf keinen Fall entflammbares oder fl chtiges l zur Wartung des Werkzeugs NUR das von dem Hersteller a...

Page 13: ...ci n no debe exceder de 90 psi 6 3bar Una presi n de aire mayor podr a crear condiciones de operaci n no seguras para la herramienta y el usuario 2 El aire comprimido debe ser enfriado y tener un filt...

Page 14: ...para el tubo ramificado va del punto al debe ser el doble del di metro de A B 2 x A El di metro C requerido para el surtido principal de aire del punto al debe ser 3 veces el tama o de A C 3 x A La lo...

Page 15: ...iada fuerza sobre sta especialmente al hacer hoyos que atraviesen por completo la pieza de trabajo 11 Atenci n la fuerza de reacci n del taladro podr a ser alta cuando la broca se estanca Esto podr a...

Page 16: ...inflamables o vol tiles para lubricar esta herramienta Utilice nicamente el lubricante recomendado por Mighty Seven o agentes autorizados Cualquier otro lubricante producir una disminuci n en el dese...

Page 17: ...m tica 1 A press o m xima de trabalho n o deve ultrapassar 90 psi 6 3 bar Press es mais altas podem danificar a ferramenta e machucar o operador 2 O ar comprimido deve ser resfriado e filtrado na sa d...

Page 18: ...ramifica o da tubula o de ar ponto a deve ser duas vezes o valor do di metro A O di metro interno C da tubula o r gida ponto a deve ser tr s vezes o di metro A O comprimento total da mangueira flex v...

Page 19: ...superf cie certifique se que ela firme ou encontra se perfeitamente fixada 10 Avance com a ferramenta de forma controlada especialmente ao efetuar furos que atravessar o completamente uma pe a 11 Fiq...

Page 20: ...mente 2 Lubrifique novamente a ferramenta a cada intervalo de 3 ou 4 horas trabalhadas 3 Utilize apenas leo m quina SAE 10 20 para lubrificar sua ferramenta pneum tica Se outro l quido foi introduzido...

Page 21: ...21 1 2 3 4 1 90 psi 6 3 2 3 4...

Page 22: ...22 A B 2 A B 2 A C 3 A C 3 A 15 4 5...

Page 23: ...23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20...

Page 24: ...24 1 4 5 1 2 3 4 3 Mighty Seven 4...

Page 25: ...25...

Page 26: ...26...

Page 27: ...27...

Page 28: ...28...

Page 29: ...5 3 8 90 0 3 0 QE 443 13 1100 4 0 90 10 53 64 3 8 3 8 90 0 3 0 QE 444 13 1300 4 8 90 10 53 64 3 8 3 8 90 0 3 0 QE 532 10 2800 4 8 90 9 9 16 2 7 3 8 90 0 2 0 QE 533 10 2200 4 0 90 9 9 32 2 7 3 8 90 0...

Page 30: ...8 1 25 10 90 0 2 0 QE 542 13 1300 112 6 3 280 1 75 10 90 0 2 0 QE 543 13 1100 135 6 3 276 1 75 10 90 0 2 0 QE 431 10 1800 112 6 3 226 1 18 10 90 0 3 0 QE 432 10 2200 135 6 3 226 1 18 10 90 0 3 0 QE 43...

Page 31: ...otal Peso Press o de opera o C digo Di metro interno da mangueira N vel de ru do N vel de vibra o Incerteza K 0 5a se a 5 m s ou K 0 4a se a 5 m s Di metro do Mandril Velocidade Livre L min bar mm Kg...

Page 32: ...amendment and is manufactured and tested according to the following standards EN ISO 11148 3 EN ISO 15744 EN ISO 28927 5 Declared in Taichung Taiwan Dated 2013 06 01 Jonney Chen Declared by QA Manage...

Page 33: ...2006 42 EC et ses amendements et qu ils ont t fabriqu s et test s selon les standards suivants EN ISO 11148 3 EN ISO 15744 EN ISO 28927 5 D clar Taichung Taiwan Date 2013 06 01 Jonney Chen Declared by...

Page 34: ...en und dass es hergestellt wird und nach den folgenden Normen gepr ft wird EN ISO 11148 3 EN ISO 15744 EN ISO 28927 5 Erkl rt in Taichung Taiwan Datum 2013 06 01 Jonney Chen Erkl rt von QA Manager Der...

Page 35: ...s enmiendas y ha sido fabricado y probado de acuerdo a los siguientes est ndares EN ISO 11148 3 EN ISO 15744 EN ISO 28927 5 Declarado en Taichung Taiwan Fecha 2013 06 01 Jonney Chen Declarado por Gere...

Page 36: ...xos tendo sido fabricado e testado de acordo com a s seguinte s normas EN ISO 11148 3 EN ISO 15744 EN ISO 28927 5 Declarada em Taichung Taiwan Datada de 2013 06 01 Jonney Chen Declarada pelo Gerente d...

Page 37: ...15744 EN ISO 28927 5 Taichung Taiwan 2013 06 01 Jonney Chen Mighty Seven International Co Ltd No 70 25 Ching Quang Rd Wujih Dist Taichung City 41466 Taiwan http www mighty seven com King Tony France...

Page 38: ...38 3 8 AIR REVERSIBLE DRILL ltem No QE 431 433 A B...

Page 39: ...e 1 17 QE 431P17 Reverse Valve Knob 1 18 QE 431P18 Screw 1 19 QE 431P19 Ball Bearing 1 20 QE 431P20 Rear End Plate 1 NO INDEX NO DESCRIPTION Q TY 21 QE 431P21 Rotor 1 22 QE 431T22 Rotor Blade 5PCS 1SE...

Page 40: ...40 3 8 AIR DRILL ltem No QE 432 434 A B...

Page 41: ...1 13 QE 432P13 Trigger 1 14 QE 432P14 O Ring 1 15 QE 432P15 Ball Bearing 1 16 QE 432P16 Rear End Plate 1 NO INDEX NO DESCRIPTION Q TY 17 QE 432T17 Spring Pin 2pcs 1SET 18 QE 432P18 Cylinder 1 19 QE 4...

Page 42: ...42 1 2 AIR REVERSIBLE DRILL ltem No QE 441 443 A B A B C...

Page 43: ...ate 1 21 QE 441P21 Rotor 1 22 QE 441T22 Rotor Blade 5pcs 1SET 23 QE 441P23 Cylinder 1 24 QE 441T24 Spring Pin 2pcs 1SET NO INDEX NO DESCRIPTION Q TY 25 QE 441P25 Front End Plate 1 26 QE 441P26 Ball Be...

Page 44: ...44 1 2 AIR DRILL ltem No QE 442 444 A B A B C...

Page 45: ...1 17 QE 442T17 Spring Pin 2PCS 1SET 18 QE 442P18 Cylinder 1 19 QE 442T19 Rotor Blade 4PCS 1SET 20 QE 442P20 Rotor 1 NO INDEX NO DESCRIPTION Q TY 21 QE 442P21 Front End Plate 1 22 QE 442P22 Ball Beari...

Page 46: ...46 3 8 AIR DRILL ltem No QE 532 A A B B...

Page 47: ...gger 1 14 QE 532P14 Ball Bearing 1 15 QE 532P15 Rear End Plate 1 16 QE 532P16 Rotor 1 17 QE 532T17 Rotor Blade 4PCS 1SET 18 QE 532P18 Cylinder 1 NO INDEX NO DESCRIPTION Q TY 19 QE 532P19 Front End Pla...

Page 48: ...48 3 8 AIR REVERSIBLE DRILL ltem No QE 533 A A B B...

Page 49: ...19 QE 533P19 Ball Bearing 1 20 QE 533P20 Rear End Plate 1 21 QE 533P21 Rotor 1 22 QE 533T22 Rotor Blade 5PCS 1SET 23 QE 533P23 Cylinder 1 NO INDEX NO DESCRIPTION Q TY 24 QE 533T24 Spring Pin 2PCS 1SET...

Page 50: ...50 1 2 AIR DRILL ltem No QE 542 A A A A B B B B C...

Page 51: ...T 18 QE 542P18 Cylinder 1 19 QE 542P19 Front End Plate 1 20 QE 542T20 Spring Pin 2PCS 1SET 21 QE 542P21 Ball Bearing 1 22 QE 542T22 Ball Bearing 3PCS 1SET NO INDEX NO DESCRIPTION Q TY 23 QE 542P23 Mai...

Page 52: ...52 1 2 AIR REVERSIBLE DRILL ltem No QE 543 A B C A B B B A A...

Page 53: ...Rotor Blade 5PCS 1SET 23 QE 543P23 Cylinder 1 24 QE 543T24 Spring Pin 2PCS 1SET 25 QE 543P25 Front End Plate 1 26 QE 543P26 Ball Bearing 1 NO INDEX NO DESCRIPTION Q TY 27 QE 543T27 Ball Bearing 3PCS 1...

Page 54: ...54...

Page 55: ...55...

Page 56: ...56...

Page 57: ...57...

Page 58: ...58...

Page 59: ...59...

Page 60: ...60...

Page 61: ...61...

Page 62: ...62...

Page 63: ...63...

Page 64: ...64...

Page 65: ...65...

Page 66: ...66...

Page 67: ...67...

Page 68: ...68...

Page 69: ...69...

Page 70: ...70...

Page 71: ...71...

Page 72: ......

Reviews: