Installation site
,
Make sure the dryer door can be
opened without hindrance after
installation.
Transporting the machine to its
installation site
When moving the machine you can
hold it by the lid where it protrudes to
the rear of the dryer. To manoeuvre the
dryer out of its packing case to its
installation site you will also need to
hold it by the front feet.
Building under a continous worktop /
in a kitchen run
,
A
building-under kit
(available
to order) with a coverplate to replace
the machine lid is required.
It must be fitted by suitably qualified
person to ensure electrical safety.
The building-under kit is supplied with
its own installation instructions.
– Slides are also available to order for
fitting underneath the machine feet to
protect the floor from damage when
the dryer is pushed into position or
taken out for servicing.
– The electrical socket must be
located in an accessible position
near the machine.
N.B. If you wish to push your machine
under a worktop and there is space to
do this
without removing the lid
the
building under kit is not necessary.
Otherwise the building under kit is
essential.
N
= Niche height (820 - 930 mm)
(illustration shows machine with lid removed)
With niche heights of:
Niche height
Action
820
None required
from 830 - 840 Fit longer screw feet*
(Set to approx.
40 mm)
from 870 -885
Use one raising kit*
from 915 -930
Use two raising kits*
If the kitchen run has a continuous
furniture plinth in place, a gap must
be made for the tumble dryer.
Replacing the lid
If the lid has been removed in order to
fit a coverplate, ensure that, if the lid is
ever replaced, it fits securely into the
rear holders. Otherwise, it is not
properly secure for transport.
Installation
38