![Miele SmartLine Tepan Yaki Operating And Installation Instructions Download Page 58](http://html.mh-extra.com/html/miele/smartline-tepan-yaki/smartline-tepan-yaki_operating-and-installation-instructions_234468058.webp)
Installation
*INSTALLATION*
58
Installing the SmartLine element
Stick the supplied sealing strip under
the edge of the SmartLine element.
Do not apply the sealing strip under
tension.
Feed the mains connection cable
down through the worktop cutout.
Position the SmartLine element in the
worktop cutout. Ensure that:
- The seal of the appliance sits flush
with the worktop on all sides to
ensure an effective seal all round.
- All gap widths are uniform.
If the seal does not meet the worktop
correctly on the corners, carefully
scribe the corner radii (
≤
R4) with a
jigsaw.
Do not use any additional sealant
(e.g. silicone) on the SmartLine
element.
Connect the SmartLine element to
the mains electricity supply.
If required, connect the SmartLine
element to the gas supply (see
“Installation – Gas connection”).
Check that the SmartLine element
works.
Seal the gaps between the individual
elements with a silicone sealant that
is heat-resistant to at least 160 °C.
Unsuitable sealant can damage
natural stone.
For natural stone worktops and
natural stone tiles, only use silicone
sealant that is specially formulated
for natural stone. Follow the
manufacturer’s instructions.
Summary of Contents for SmartLine Tepan Yaki
Page 2: ......
Page 52: ...Installation INSTALLATION 52 Worktop cutout surface mounted ...
Page 70: ......