Installation
58
Preparing the worktop
Create the worktop cut-out. Remem-
ber to maintain the minimum safety
distances (see “Safety distances”).
Seal any cut surfaces on
wooden
worktops
with a special varnish, sil-
icone rubber or resin to prevent the
wood from swelling as a result of
moisture. The sealant must be tem-
perature-resistant.
Make sure that the sealant does not
come into contact with the top of the
worktop.
Flush-fit installation
For wooden worktops, secure the
wooden frames 5.5 mm below the
upper edge of the worktop.
For CS 7611, the wooden frame must
be secured 7 mm under the upper
edge of the worktop.
Fitting the spacer bars
Use the middle screw holes if one of the
following SmartLine elements is in-
stalled to the right or left of the spacer
bar: CS 7611, CS 7101, CS 7102
Wooden worktops
Position the spacer bars flush onto
the upper edge of the cut-out or onto
the lower step of the stepped cut-out.
Secure the spacer bars with the
3.5 x 25 mm wood screws supplied.
Summary of Contents for SmartLine CS 7632
Page 49: ...Building in dimensions 49 Onset installation a Front b Mains connection cable L 2000 mm ...
Page 64: ......
Page 65: ......
Page 66: ......