background image

 

Installationsplan / Installation plan: PT 8803/8805/8807 
Datum / Date: 12.01.2011 

Seite / Page: 10 

 

 

 

Equipotential 

bonding 

Connection with male thread  

mm 

10 × 35 

with washers and nut.  

M  

10 

Accessories not included (except with offshore version). 

 

 

If necessary, equipotential bonding with good galvanic 
contact must be provided in accordance with all appropriate 
national and local regulations. 

 

 

 

Peak load energy 

management 

Control contact voltage 

AC 230  

Connection cable, min. cross-section 

mm² 

5 × 1.5 

Connection cable (to be ordered separately) 

 

 

 

 

Connection via a flexible supply lead with a separate isolator 
is recommended. The isolator should be visible and easily 
accessible after machine installation. 

 

 

 

Vented 

Max. nominal air flow in vented mode (PT 8807 only) 

m³/h 

1100 

Nominal air flow (PT 8803/8805 only) 

m³/h 

1000 

 

Max. permissible pressure loss 

Pa 

300 

 

Connection on machine side (ext. diameter) 

mm 

150 

 

 

Connection pipe provided on site (int. diameter) 

mm 

150 

 

 

Max. temperature 

°C 

80  

 

 

As relative humidity inside the vent ducting can be as high as 
100%, suitable measures must be taken to prevent a 
backflow of condensate into the machine. 

 

 

 

Air intake 

Standard connection: Air intake from installation site 

 

 

Unobstructed air intake into room recommended (corres-
ponding to 3 times the vent cross-section of machine) 

cm² 

531 

A sufficient supply of fresh air should be ensured to 
replace the air extracted. 

 

 

 

 

Alternative connection: Ducted air intake (from outside 
building) 

 

 

 

 

Connector on machine (int. diameter) 

mm 

161 

 

 

Connection pipe provided on site (ext. diameter) 

mm 

160 

 

 

Lid removal exposes live components! For safety reasons, 
the pipe connected for central air intake should be at least 
900 mm long and secured using two screws. 

 

 

 

Fittings (supplied)  Without plinth 

 

 

2 × clamps 

 

 

 

2 × screws DIN 571 (Ø × length) 

mm 

6 × 40 

 

 

2 × rawl plugs (Ø × length) 

mm 

10 × 50 

 

 

The machine should be bolted to the floor. 

 

 

 

 

Fixing materials for a floating screed floor are to be provided 
on site. 

 

 

 

 

On concrete platform 

 

 

 

 

2 × clamps 

 

 

 

 

2 × screws DIN 571 (Ø × length) 

mm 

6 × 40 

 

 

2 × rawl plugs (Ø × length) 

mm 

10 × 50 

 

 

Machine must be bolted to the floor! 

 

 

 

 

Fixing materials for a floating screed floor are to be provided 
on site. 

 

 

 
 

 

Summary of Contents for PT 8803 EL

Page 1: ...02 11 Mat NR 07 803 900 02 Installation plan Tumble dryers Installatieschema Droogautomaat PT 8803 EL PT 8805 EL PT 8807 EL nl NL en GB ...

Page 2: ...eert en in gebruik neemt Dat is veiliger voor uzelf en u voorkomt schade aan uw apparaat Technische wijzigingen voorbehouden It is essential to read the operating and installation instructions before installing commissioning or using the machine This avoids the risk of accidents or damage All rights reserved ...

Page 3: ......

Page 4: ......

Page 5: ......

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ...e min cross section mm 5 16 Cable screw connector M 50 Connection cable to be ordered separately 2 Standard voltage as supplied V 3 AC 220 240 Frequency Hz 50 Rated load kW 34 8 41 1 Fuse rating A 3 100 Connection cable min cross section mm 4 25 Cable screw connector M 50 Connection cable to be ordered separately Non standard voltages OS 440 Standard voltage as supplied V 3 AC 440 Frequency Hz 60 ...

Page 10: ...As relative humidity inside the vent ducting can be as high as 100 suitable measures must be taken to prevent a backflow of condensate into the machine Air intake Standard connection Air intake from installation site Unobstructed air intake into room recommended corres ponding to 3 times the vent cross section of machine cm 531 A sufficient supply of fresh air should be ensured to replace the air ...

Page 11: ...hine mm 1800 Min wall gap to rear edge of lid mm 500 Net weight kg 286 Dynamic floor load max N 3394 Average heat dissipation dependent on ambient room temperature and programme selected W 973 A Noise level dB A 73 6 A Sound pressure level measured at a distance of 1 m from the machine and at a height of 1 6 m 1 m dB A 62 Installation should only be carried out by authorised fitters in accordance ...

Page 12: ...0 De aansluitkabels worden niet bijgeleverd 2 Standaardspanning af fabriek V 3 AC 220 240 Frequentie Hz 50 Aansluitwaarde kW 34 8 41 1 Zekering A 3 100 Aansluitkabel draaddoorsnede minimaal mm 4 25 Kabelwartel M 50 De aansluitkabels worden niet bijgeleverd Afwijkende spanningen OS 440 Afwijkende spanning af fabriek V 3 AC 440 Frequentie Hz 60 Aansluitwaarde kW 37 9 Zekering A 3 63 Aansluitkabel dr...

Page 13: ...n het apparaat terechtkomt Luchttoevoer Standaardaansluiting Toevoer uit de ruimte waar de machine staat opgesteld Aanbevolen vrije diameter luchttoevoer in de ruimte is 3x de diameter van de luchtafvoer van het apparaat cm 531 Er moet voldoende luchttoevoer zijn naar de ruimte waar het apparaat staat opgesteld om de afgevoerde luchthoeveelheid te compenseren Alternatieve aansluiting Aansluiting l...

Page 14: ... deksel mm 500 Nettogewicht kg 286 Vloerbelasting bij gebruik max N 3 394 Gemiddelde warmteafgifte aan de ruimte afhankelijk van omgevingstemperatuur en gekozen programma W 973 A gewogen geluidsvermogen dB A 73 6 A gewogen geluidsdruk werkplekspecifiek afstand 1 m hoogte 1 6 m dB A 62 De installatiewerkzaamheden mogen alleen door een erkend installateur worden uitgevoerd met inachtneming van alle ...