The oven must be installed into
cabinetry and be supported from
underneath.
,
IMPORTANT INFORMATION
For proper heat ventilation a 24"
2
(150 cm
2
) cut out must be made
within the cabinetry.
Do not make this cutout flush to the
wall or to "dead space". Room air
must be allowed to circulate. Certain
cabinet installations could require
the toekick area to be additionally
vented.
Do not insulate the cabinet. This will
prevent proper ventilation.
^
Adhere the skid plates to the cabinet
floor.
^
Prepare the door for removal.
Flip up the locking clamps on each
door hinge.
Installing the oven
65