Maintenance and
Disassembly
Page 25
1.3 Re-Installation
1.3.1 Indoor Unit
Collecting the refrigerant into the outdoor unit
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
)RUYK
)RUYK
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
)RUYK
2U
.O
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the charge hose with the push pin of Handle
Lo to the 3-way valve’s gas service port.
3.
Open the Handle Lo manifold valve to purge air
from the charge hose for 5 seconds and then close it
quickly.
4.
Close the 2-way valve.
5.
Operate the air conditioner in cooling mode. Cease
operations when the gauge reaches 0.1 MPa
(14.5 Psi).
6.
Close the 3-way valve so that the gauge rests
between 0.3 MPa (43.5 Psi) and 0.5 MPa (72.5 Psi).
7.
Disconnect the charge set and mount the caps of
service port and 2- and 3-way valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18N.m.
9.
Check for gas leakage.
Summary of Contents for MISSION2 3D INVERTER Series
Page 2: ......
Page 4: ......
Page 11: ...Specifications Page 7 MOB01 09HFN1 MW0W MOB01 12HFN1 MV0W MOCA01 18HFN1 MT0W...
Page 12: ...Specifications Page 8 MOD01 23HFN1 MT0W...
Page 15: ...Specifications Page 11 PCB board of MOD01 23HFN1 MT0W...
Page 16: ...Specifications Page 12 IPM board of MOD01 23HFN1 MT0W...