Midea Precisi
42
3.1 Storag
Sto
Am
Am
Sto
3.2 Indoor
Ta
wo
Mo
the
In
o
nor
Co
mo
con
Ou
deh
inh
win
Bec
dam
ind
To
uni
Do
refr
on AC Technic
ge environ
Items
orage environ
mbient humidi
mbient temper
orage time
r installati
ke down the
ooden case.
ove the back
e bolts with w
order to ens
rmally, it sho
mputer room
oisture-proof
ncrete wall a
tdoor air ent
humidifyting
aled quantit
ndows shoul
cause the a
mage of othe
oor unit, and
ensure the n
t installation
not install th
rigeration cy
cal Manual
nment
nment Ind
ity 5%
rature Ind
Tot
mo
ion
e packaging
k plate, and
wrench.
ure that the
ould do the m
m should ha
f layer of cei
and ground m
ter into the r
load, so it is
ty should rem
d be fully en
ir conditione
er precision
d the installa
normal oper
n site.
he indoor un
ycle, and the
oor, clean.
~85% RH (N
oor unit: -20
°
tal time of tr
nths. If exce
case, accor
the unit bas
environmen
moisture-pro
ve good the
ling and wal
must be mo
room may in
s necessary
main below
nclosed type
er will produc
equipments
ation scene
ration of indo
nit in the nar
en leads to a
R
No condensa
°C~54°C; Out
ransportation
ed 6 months
rding to the
se was fixed
nt control sy
oof and heat
ermal insulat
ll must use p
isture-proof
ncrease the
y to minimize
5%of whole
e, and apert
ce the cond
s nearby, the
of air condit
oor unit, it s
rrow space,
a short circu
Requirement
ation)
tdoor unit:
-40
n and storag
s, it need to r
package dia
d in the botto
ystem in the
t preservatio
tion and sea
polyethylene
.
system coo
e outdoor ai
e indoor air c
ure are as s
ensate and
ere is not th
tioner must
hould choos
or it would b
it of returnin
M
ts
0
°C~70°C.
e time shou
re-calibrate th
agram to rem
om wood tray
air condition
on work.
aled moisture
e film materi
ling, heating
r enter into t
circulation am
small as pos
water leaka
e precision e
be provided
se capacious
block the air
ng air and ai
MCAC-PDSM
uld not excee
he capacity.
move the pa
y with M8 b
ning room w
e-proof laye
ials. The pa
g, humidifyin
the room. O
mount, all th
ssible.
age may cau
equipments
d the drainag
s space as t
r flow, and s
r noise.
M-2013-01
ed 6
ackaging
olts, remove
works
er, the
inting of
ng and
Outdoor air
he doors and
use the
near the
ge pipelines
the indoor
horten the
e
d
.
All manuals and user guides at all-guides.com