6
7
www.freedomhp.co.uk
02380 274 833 | [email protected]
Heating & hot water schematic
Piping the unit
Every system will have a low loss header (buffer or plate heat exchanger) in the heating circuit, there are no short cuts.
If you install the unit with no low loss header, you will void the warranty
Pump PO
Timer for
Immersion
SV1
AB
B
A
Header,
Buffer or
Heat
Exchanger
Z2
Z1
Extras
Heating & Hot Water
•
Midea unit
•
Feet Small
•
Midea adapter 1 1/4” to 1 “
•
2x Fibre washer 1 1/4”
•
2x Fibre washer 1”
•
2x Flexi Hoses
•
Robotkit ( only needed on
8-16kW units )
•
1x Pump
•
1x 28mm 3 port valve
•
Filter Ball
•
Glycol
•
Header
•
32A Isolator
•
2x Electric Meter
Optional
•
Cylinder
•
Immersion Timer
•
Delivery
•
Install Manual
The water connections are flow at the top and the return at the top bottom, they are 1 1/4” male, we will deliver it with
an adapter to 1” male and will supply flexi hoses to fit. You must use 28mm copper or plastic pipe to connect the unit .
The pump in the unit is strong enough to push the water a maximum of 12m each way to the hot water cylinder and
The low loss header. If your pipe length is more than 12m of 28mm copper please call us first
Coding
Assembly Unit
1
High voltage wire hole
2
Low voltage wire hole
3
Drainage pipe hole
4
Water outlet
5
Water inlet
4/6 kW
8~16 kW
1
2
4
3
5
4
5
3
2
1