2
Notes Before Installation
1. Select the correct carry-in path.
2. Move this unit as originally packaged as possible.
3. If the air conditioner is installed on a metal part of the building, it must be electrically
insulated according to the relevant standards to electrical appliances.
e. In buses or cabinets.
f. In kitchen where it is full of oil gas.
g. There is strong electromagnetic wave existing.
h. There are inflammable materials or gas.
i. There is acid or alkaline liquid evaporating.
j. Other special conditions.
NOTE:
Remark per EMC Directive 89/336/EEC
For to prevent flicker impressions during the start of the compressor (technical process),
following installation conditions apply.
1. The power connection for the air conditioner has to be done at the main power distribution.
The distribution has to be of a low impedance, normally the required impedance reaches
a 32A fusing point.
at
2. No other equipment has to be connected with this power line.
3. For detailed installation acceptance, please refer to your contract with the power supplier
restrictions do apply for products like washing machines, air conditioners or electrical
if
ovens.
4. For power details of the air conditioner, refer to the rating plate of the product.
5. For any question contact your local dealer.
Summary of Contents for CEILING TYPE
Page 19: ...MDV05I 011aW 2200019056 ...