
microcanner MCMAX
MC-MAX (V1.0)
PAGE 15 OF 32
2.
Start with the machine on, and in manual mode. ( reference
section
7 [F1] for manual mode)
3.
Take a can and fill it with water to give it structural rigidity.
The can will get crushed without fluid in it while it’s running
through the seaming station.
4.
Place an end on the can, and place it on the conveyor prior
to the seaming station
5.
The following steps will be done using the seam setup
controls screen (F5).
6.
Press “seamer 1” button
7.
Press the indexer button to Index the can into position.
8.
Make sure the can is in the correct position
9.
press “op 1” to run a op 1 test
10.
Repeat step 6, then press “op2” to run a op 2 test
11.
Repeat 6, then press “op 1 & 2” to run a combined test,
where both operations run like in auto.
12.
Measure the seam and compare to seam dimensions on the
seam reference screen under the help screen screen on F1.
If dimensions are out of tolerance adjust the tooling until
within spec.
13.
Do operation 1 until good, then proceed to operation 2, then
check a sequential run.
14.
Repeat this process for both seamers