MDM50 HP Version User’s Manual
2
97478 Issue 1.4, October 2019
INSTALLATION
2
INSTALLATION
On delivery, please check that all the following standard components are present in the
packing box:
•
MDM50-HP
•
Swagelok
®
6mm or 1/4" metering valve
•
Swagelok
®
6mm or 1/4" port adaptor
•
Battery charger
•
Mains lead
•
3 pole ¼” jack plug (inside lid)
•
Certificate of calibration
Before using the MDM50-HP for the first time it is recommended that the battery pack
is charged for a minimum of 12 hours.
The supplied Swagelok
®
port adaptor needs to be assembled before the metering valve
can be connected to the instrument.
See below:
1. Slip the nut over the
machined ferrule end of
the port connector
2. Insert the port connector
into the end connection and
finger-tighten the nut
3. While holding the fitting
body steady, tighten the
nut one-quarter turn
Do not use the Swagelok gap inspection
gauge with machined ferrule ends.
!
1. Slip the nut over the
machined ferrule end of
the port connector
2. Insert the port connector
into the end connection and
finger-tighten the nut
3. While holding the fitting
body steady, tighten the
nut one-quarter turn
Do not use the Swagelok gap inspection
gauge with machined ferrule ends.
!
1. Slip the nut over the
machined ferrule end of
the port connector
2. Insert the port connector
into the end connection and
finger-tighten the nut
3. While holding the fitting
body steady, tighten the
nut one-quarter turn
Do not use the Swagelok gap inspection
gauge with machined ferrule ends.
!