 6 / 9 

 

3.3.1

 Fix Adjustable Tube 

Connectors onto the Adjustive 
Pole with two sets of 
Hexagonal Bolt M14*150. 
 

3.3.2 

Connect the PR-6 Girder, 

pre-assembled Adjustive Pole 
and Splices for Post with 
Hexagonal Bolt M14*150 
(

Refer to picture 3-3-1

). 

 
The tilt angle of the system 
can be adjustable by changing 
the position of Adjustive Pole 
with 10, 20, 30, 40, 50 and 60 
degrees at your disposal. 
 
(

Tips:

 To make an easier 

assembling & installation for 
the rest components, the tilt 
angle of system can be 
changed to 10 degrees firstly, 
connecting the Girder onto the 
hole of Adjustive Pole at the 
top.) 

 

 

3.3.3 

Fix Built-in Fitments for 

Beam onto the Girder with two 
sets of Hexagonal Bolt M12*75 
respectively, making sure they 
are located 
symmetrically.(

Refer to 

picture 3-3-2

 

3.3.4 

Connect the Beam with 

Built-in Fitment by two sets of 
Hexagonal Bolt M12*90. 
(

Refer to picture 3-3-3

 
(

Tips: 

Please make sure two 

beam ends are approximately 
parallel to each other. When 
“d1=d2”, two Beams are 
located in parallel)  
 
 
 
 
 

 
 

 

3.4 Install the Rail 50 

d1 

d2 

3-3-1 

d1 

d2 

3-3-2 

3-3-3 

Summary of Contents for MRac Pole Rack 6

Page 1: ...592 3754999 Xiamen China 361022 Fax 86 592 6771575 www mbt energy com Email sales mbt energy com 1 9 MRac Pole Rack 6 Installation Guide Content 1 Product Introduction P2 2 Installation Tools Components P3 3 Installation Instruction P4 4 10 Years Warranty Declaration P7 ...

Page 2: ...e pay attention to the relevant regulations of your local region Please check that you are using the current version of the installation manual by contacting Mibet Energy via mail sales mbt energy com or our local representatives Get all components ready including the panels it will take around one hour and a half for 4 well trained workers to finish the installation of one set of Pole Rack 6 The ...

Page 3: ...allation Tool 4 6mm Inner Hexagon Spanner 2 5m Tape 4 12 Spanner 2 2 Main Components Components End Clamp Kit Inter Clamp Kit C Clamp Kit Rail 50 Adjustable Tube Connector Adjustive Pole Beam Built in Fitment for Beam Splice for Post Girder PR 6 Quadrate Post 2 3 Solution Overview 1 End Clamp Kit 2 Inter Clamp Kit 3 C Clamp Kit 4 Rail 50 5 Beam 6 Built in Fitment for Beam 7 Girder 8 Adjustable Tub...

Page 4: ...lice for Post 11 PR 6 Quadrate Post 3 Installation Instruction 3 1 Install PR 6 Quadrate Post 3 1 1 Dig a hole depth at 1200 1500mm with dimension around 600 700mm leaving graves at the bottom around 70mm 3 1 2 Put the PR 6 Quadrate Post into the hole directly input mud fluid into this hole while make sure perpendicularity error of the Post is within 2 3 2 Install Splices for Post and Girder ...

Page 5: ...t energy com Email sales mbt energy com 5 9 3 2 1 Fix two Splices for Post onto the Quadrate Post by two sets of Hexagon Bolts M14 150 as Picture 3 2 1 shows 3 2 2 Put the Girder between the two Post Splices fix it with M14 150 Hexagon Bolts as planned Refer to picture 3 2 2 3 3 Install Adjustive Pole and PR 6 Beam 3 2 1 3 2 2 ...

Page 6: ...ith 10 20 30 40 50 and 60 degrees at your disposal Tips To make an easier assembling installation for the rest components the tilt angle of system can be changed to 10 degrees firstly connecting the Girder onto the hole of Adjustive Pole at the top 3 3 3 Fix Built in Fitments for Beam onto the Girder with two sets of Hexagonal Bolt M12 75 respectively making sure they are located symmetrically Ref...

Page 7: ...lace all other Rail 50 as planned Tips Make sure all rail ends are in the same line that is The distance between ends of 4 Rails and the side part of Beams should remain the same 3 5 Install solar Panels 3 5 1 Install the panels as planned Put panels onto the Rail 50 and fix them with Inter Clamps Kits and End Clamps Kits Tips Put one Inter Clamp between two panels remove it after the panels fixed...

Page 8: ...allation of the Product is not performed in accordance with Mibet s written installation instructions or if the Product has been modified repaired or reworked in a manner not previously authorized by Mibet IN WRITING or if the Product is installed in an environment for which it was not designed Mibet shall not be liable for consequential contingent or incidental damages arising out of the use of t...

Page 9: ...ke a claim against us directly In order to make a claim against us you must post fax or email us a notice using the contact details set out below In your notice you must provide details of why you believe the Frame is defective a copy of your invoice receipt or any other document which provides proof of purchase Details of any expenses you have incurred in making your claim and details of how we s...

Reviews: