Mibet (Xiamen) New Energy Co., Ltd.
No 69, Xintian Rd., Jimei District,
Tel: +86592 3754999
Xiamen China 361022
Fax: +86 592 6771575
www.mbt-energy.com
Email:
6 / 9
3.3.1
Fix Adjustable Tube
Connectors onto the Adjustive
Pole with two sets of
Hexagonal Bolt M14*150.
3.3.2
Connect the PR-6 Girder,
pre-assembled Adjustive Pole
and Splices for Post with
Hexagonal Bolt M14*150
(
Refer to picture 3-3-1
).
The tilt angle of the system
can be adjustable by changing
the position of Adjustive Pole
with 10, 20, 30, 40, 50 and 60
degrees at your disposal.
(
Tips:
To make an easier
assembling & installation for
the rest components, the tilt
angle of system can be
changed to 10 degrees firstly,
connecting the Girder onto the
hole of Adjustive Pole at the
top.)
3.3.3
Fix Built-in Fitments for
Beam onto the Girder with two
sets of Hexagonal Bolt M12*75
respectively, making sure they
are located
symmetrically.(
Refer to
picture 3-3-2
)
3.3.4
Connect the Beam with
Built-in Fitment by two sets of
Hexagonal Bolt M12*90.
(
Refer to picture 3-3-3
)
(
Tips:
Please make sure two
beam ends are approximately
parallel to each other. When
“d1=d2”, two Beams are
located in parallel)
3.4 Install the Rail 50
d1
d2
3-3-1
d1
d2
3-3-2
3-3-3