Make sure that the model of automation you have chosen properly suits Please consider that:
The hinges of the gate are in the middle of the pillar
your gate hinges are in a good condition and correctly greased
The hinges of the gate are on the edge of the pillar
your gate is equipped with opening and closing ground-stops
INSTALLATION OF THE FOUNDATION CASE
Dig a hole in the ground to host the foundation case (Fig. D).
Please refer to the attached “Wiring scheme” for the correct connections -
Place the foundation case into the excavation. Make sure that the pin
of the bracket that moves the gate is lined up with the gate hinge and
All connections have to be carried out while the equipments are not
keep a minimum distance of 65mm between the pin of the case and
A safety electrical switch should be connected to the equipment -
Provide the installation with a drain from the hole
according to any security provision for electrical installations currently in
foundation case to prevent the water from stagnating.
Provide the case with an entry for the wires through the
The main power supply should always be protected by a 6A automatic
switch or by a 16A mono-phase switch complete with fuses
Underground the foundation case into the concrete. Pay attention that
Use separate main lines to power the motors, the control unit and the
the case lays flat and in the correct position.
accessories to avoid interferences and troubles in operation
Grease the ball and place it in its seat; put the support bracket
Any control or safety device connected to the control unit has to be
Place the gate's wing on the support bracket
perfect aligned and the fasten it to the bracket (Fig. E).
Place the motor on the case floor (make sure that there are no
remains of concrete) according to the right/left orientation as shown in
Please refer to the “Generals Warnings” attached to this manual for an
figure M and fix it to with washers and M12 nuts (Fig. F).
appropriate use of the product and to avoid any damage to persons, -
bracket and fasten it with washers and screws.
The use of this automation musts comply with the regulations currently in -
Close the foundation case and fix the cover using the provided
force in the country of installation and to the general rules of good
You can make the gate opening outward by turning the motor of
The warranty coverage lapses in case of negligence in use or
180° inside the foundation case.
installation, as well as in case of lightings or overvoltage.
The manufacturer is not liable for defects caused by faulty assembling or
for assembling, nor for defects caused by alterations of the product.
ground-stops in closing and opening is highly recommended.
Insert the key into the lock on the support bracket (Fig. I)
INSTALLATION INSTRUCTION SEQUENCE
Turn the key clockwise and take the lock out.
Before starting the installation, please refer to the “
Insert the release bracket and turn it toward the centre of the gate (Fig.
attached to this manual and carry on the risks analysis accurately. In the
case of residual risks, further safety precautions must be provided.
Now you can move the gate manually: the electric opening will be
Check first the above mentioned safety rules.
automatically restored at the first operation.
Identify and check all the components of the system.
Don't forget to put the lock back to its place.
Determine the correct placement of the motor.
Dig the foundation in to the ground.
You can use this optional device to make the gate opening up to 180° as
Provide a drain for the water.
Place the wires as described in the “
Put the motor in to the foundation case and fix it.
TCE 10x70 screw and the nut (turn the screw only, the nut remains
Assemble the leverage for the gate moving.
Replace the lower part of the support bracket
Fix the gate wing to the leverage.
Link the two parts together by the transmission chain
Wire the control unit to the motor and to all other accessories.
Follow the control unit manual to code the radio receiver and program
INSTALLATION OF THE ELECTROLOCK
An electro-lock can be installed on the first opening wing of the gate and wire
Should the system not working correctly please refer to the trouble-
shooting page of the control unit manual or contact your distributo
: The electro-lock is installed horizontally and it's closing on the
second opening wing (in such the second opening wing needs a floor
The underground motor is supplied in the blocked version.
: The electro-lock is installed vertically and it's latching to the floor