20
Step 15:
Attach (2) Baseboards (C05) to the Tower Legs (L05) using (2) Bolts (A-2). Ensure that
the Baseboards are placed with the measurements between the bolt holes oriented
as shown and that the small predrilled holes are towards the top of the Baseboards.
Step 16:
Insert (3) Nuts (A-2) into (1) Tower Leg (L02) as shown. Orient the Tower Leg as shown
with the (5) large predrilled holes facing up.
37
Step 49:
Attach (1) Floor Support (H1) to the Baseboards (C05) using (4) Screws (C4). Ensure
that the Floor Support is aligned with the top edge of the Baseboards.
Step 50:
Attach (2) Floorboards (C17) to the Floor Supports (C10) and (H1) using (12)
Screws (C2).
90°
90°